Similar Projects
Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Blanco Road Phase II
Results
$19,200,000 est. value
San Antonio, TX 78207

Southern Region Disaster Recovery Support BPA
Results

Last Updated 06/04/2021 06:02 AM
Project Title

SH 101 - Rehabilitate Existing Roadway

Physical Address View project details and contacts
City, State (County) TX   (Wise County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,645,486
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing RowDollarsAnd CentsSta 60.000 1 104 6017 Removing Conc (Driveways)DollarsAnd CentsSy 734.000 2 105 6105 Removing Stab Base And Asph Pav(15")DollarsAnd CentsSy 9,341.000 3 105 6128 Removing Untreated Base (8")DollarsAnd CentsSy 200.000 4 110 6001 Excavation (Roadway)DollarsAnd CentsCy 31,718.000 5 132 6004 Embankment (Final)(Dens Cont)(Ty B)DollarsAnd CentsCy 13,987.000 6 134 6005 Backfill Ty ADollarsAnd CentsCy 102.000 7 161 6017 Compost Manuf Topsoil (4")DollarsAnd CentsSy 50,596.000 8 164 6009 Broadcast Seed (Temp) (Warm)DollarsAnd CentsSy 25,298.000 9 164 6011 Broadcast Seed (Temp) (Cool)DollarsAnd CentsSy 25,298.000 10 164 6023 Cell Fbr MlchSeed(Perm)(Rural)(Clay)DollarsAnd CentsSy 50,596.000 11 168 6001 Vegetative WateringDollarsAnd CentsMg 1,771.000 12 247 6041 003 Fl Bs (Cmp In Plc)(Tya Gr1-2)(Fnal Pos)DollarsAnd CentsCy 1,823.000 13 260 6002 Lime (Hydrated Lime (Slurry))DollarsAnd CentsTon 1,237.000 14 260 6022 Lime Trt (Exist Matl)(18")DollarsAnd CentsSy 10,945.000 15 260 6027 Lime Trt (Exst Matl)(8")DollarsAnd CentsSy 21,191.000 16 305 6018 Salv,Haul & Stkpl Rcl Aph Pv (2")DollarsAnd CentsSy 22,184.000 17 310 6001 Prime Coat (Multi Option)DollarsAnd CentsGal 7,042.000 18 340 6272 003 Tack CoatDollarsAnd CentsGal 13,062.000 19 351 6004 Flexible Pavement StructureRepair(8")DollarsAnd CentsSy 833.000 20 360 6006 Conc Pvmt (Cont Reinf - Crcp) (12")DollarsAnd CentsSy 15,348.000 21 360 6084 Conc Pvmt (Jointed-Cpcd)(Hes)(13")DollarsAnd CentsSy 1,994.000 22 400 6008 Cut & Restore Asph PavingDollarsAnd CentsSy 63.000 23 432 6010 Riprap (Conc)(Cl B)(5 In)DollarsAnd CentsCy 159.000 24 432 6024 Riprap (Stone Common)(Dry)(12 In)DollarsAnd CentsCy 63.000 25 462 6050 002 Conc Box Culv (5 Ft X 2 Ft)(Extend)DollarsAnd CentsLf 40.000 26 464 6017 001 Rc Pipe (Cl Iv)(18 In)DollarsAnd CentsLf 455.000 27 464 6018 001 Rc Pipe (Cl Iv)(24 In)DollarsAnd CentsLf 232.000 28 467 6177 Set (Ty I)(S= 5 Ft)(Hw= 4 Ft)(4:1) (C)DollarsAnd CentsEa 1.000 29 467 6358 Set (Ty Ii) (18 In) (Rcp) (4: 1) (C)DollarsAnd CentsEa 4.000 30 467 6363 Set (Ty Ii) (18 In) (Rcp) (6: 1) (P)DollarsAnd CentsEa 12.000 31 467 6390 Set (Ty Ii) (24 In) (Rcp) (4: 1) (C)DollarsAnd CentsEa 2.000 32 467 6394 Set (Ty Ii) (24 In) (Rcp) (6: 1) (C)DollarsAnd CentsEa 2.000 33 467 6395 Set (Ty Ii) (24 In) (Rcp) (6: 1) (P)DollarsAnd CentsEa 4.000 34 496 6005 Remov Str (Wingwall)DollarsAnd CentsEa 1.000 35 496 6007 Remov Str (Pipe)DollarsAnd CentsLf 62.000 36 500 6001 MobilizationDollarsAnd CentsLs 1.000 37 502 6001 008 Barricades, Signs And Traffic HandlingDollarsAnd CentsMo 18.000 38 506 6003 005 Rock Filter Dams (Install) (Ty 3)DollarsAnd CentsLf 50.000 39 506 6011 005 Rock Filter Dams (Remove)DollarsAnd CentsLf 50.000 40 506 6020 005 Construction Exits (Install) (Ty 1)DollarsAnd CentsSy 312.000 41 506 6024 005 Construction Exits (Remove)DollarsAnd CentsSy 312.000 42 506 6038 005 Temp Sedmt Cont Fence (Install)DollarsAnd CentsLf 5,235.000 43 506 6039 005 Temp Sedmt Cont Fence (Remove)DollarsAnd CentsLf 5,235.000 44 506 6041 005 Biodeg Erosn Cont Logs (Instl) (12")DollarsAnd CentsLf 700.000 45 506 6043 005 Biodeg Erosn Cont Logs (Remove)DollarsAnd CentsLf 700.000 46 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1)DollarsAnd CentsLf 2,880.000 47 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2)DollarsAnd CentsLf 200.000 48 512 6033 Port Ctb (Move)(Low Prof)(Ty 1)DollarsAnd CentsLf 2,240.000 49 512 6034 Port Ctb (Move)(Low Prof)(Ty 2)DollarsAnd CentsLf 40.000 50 512 6037 Port Ctb (Stkpl)(Sgl Slp)(Ty 1)DollarsAnd CentsLf 340.000 51 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1)DollarsAnd CentsLf 2,880.000 52 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2)DollarsAnd CentsLf 200.000 53 530 6004 Driveways (Conc)DollarsAnd CentsSy 281.000 54 530 6005 Driveways (Acp)DollarsAnd CentsSy 187.000 55 530 6017 Driveways (Conc) (Hes)DollarsAnd CentsSy 478.000 56 533 6003 Rumble Strips (Shoulder) AsphaltDollarsAnd CentsLf 12,140.000 57 533 6004 Rumble Strips (Centerline) AsphaltDollarsAnd CentsLf 175.000 58 533 6005 Rumble Strips (Shoulder) ConcreteDollarsAnd CentsLf 7,090.000 59 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(P)DollarsAnd CentsEa 24.000 60 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(T)DollarsAnd CentsEa 12.000 61 644 6076 Remove Sm Rd Sn Sup&AmDollarsAnd CentsEa 3.000 62 658 6099 Instl Om Assm (Om-2z)(Wflx)GndDollarsAnd CentsEa 32.000 63 662 6004 Wk Zn Pav Mrk Non-Remov (W)4"(Sld)DollarsAnd CentsLf 8,743.000 64 662 6034 Wk Zn Pav Mrk Non-Remov (Y)4"(Sld)DollarsAnd CentsLf 7,619.000 65 662 6047 Wk Zn Pav Mrk Remov (Refl) Ty I-ADollarsAnd CentsLf 6,372.000 66 662 6049 Wk Zn Pav Mrk Remov (Refl) Ty I-CDollarsAnd CentsLf 17,227.000 67 662 6051 Wk Zn Pav Mrk Remov (Refl) Ty Ii-A-ADollarsAnd CentsLf 11,451.000 68 662 6057 Wk Zn Pav Mrk Remov (Traf Btn) Ty WDollarsAnd CentsLf 17,227.000 69 662 6059 Wk Zn Pav Mrk Remov (Traf Btn) Ty YDollarsAnd CentsLf 11,451.000 70 662 6109 Wk Zn Pav Mrk Sht Term (Tab)Ty WDollarsAnd CentsEa 487.000 71 662 6110 Wk Zn Pav Mrk Sht Term (Tab)Ty YDollarsAnd CentsEa 443.000 72 662 6111 Wk Zn Pav Mrk Sht Term (Tab)Ty Y-2DollarsAnd CentsEa 27.000 73 666 6030 007 Refl Pav Mrk Ty I (W)8"(Dot)(100mil)DollarsAnd CentsLf 433.000 74 666 6036 007 Refl Pav Mrk Ty I (W)8"(Sld)(100mil)DollarsAnd CentsLf 1,916.000 75 666 6141 007 Refl Pav Mrk Ty I (Y)12"(Sld)(100mil)DollarsAnd CentsLf 1,235.000 76 666 6224 007 Pavement Sealer 4"DollarsAnd CentsLf 10,915.000 77 666 6226 007 Pavement Sealer 8"DollarsAnd CentsLf 441.000 78 666 6228 007 Pavement Sealer 12"DollarsAnd CentsLf 32.000 79 666 6230 007 Pavement Sealer 24"DollarsAnd CentsLf 35.000 80 666 6231 007 Pavement Sealer (Arrow)DollarsAnd CentsEa 2.000 81 666 6232 007 Pavement Sealer (Word)DollarsAnd CentsEa 2.000 82 666 6300 007 Re Pm W/Ret Req Ty I (W)4"(Brk)(100mil)DollarsAnd CentsLf 1,960.000 83 666 6303 007 Re Pm W/Ret Req Ty I (W)4"(Sld)(100mil)DollarsAnd CentsLf 12,126.000 84 666 6315 007 Re Pm W/Ret Req Ty I (Y)4"(Sld)(100mil)DollarsAnd CentsLf 14,282.000 85 668 6076 Prefab Pav Mrk Ty C (W) (24") (Sld)DollarsAnd CentsLf 35.000 86 668 6077 Prefab Pav Mrk Ty C (W) (Arrow)DollarsAnd CentsEa 11.000 87 668 6085 Prefab Pav Mrk Ty C (W) (Word)DollarsAnd CentsEa 9.000 88 668 6092 Prefab Pav Mrk Ty C (W) (36")(Yld Tri)DollarsAnd CentsEa 34.000 89 668 6110 Prefab Pav Mrk Ty C (Y) (Med Nose)DollarsAnd CentsEa 1.000 90 672 6007 Refl Pav Mrkr Ty I-CDollarsAnd CentsEa 78.000 91 672 6009 Refl Pav Mrkr Ty Ii-A-ADollarsAnd CentsEa 246.000 92 672 6010 Refl Pav Mrkr Ty Ii-C-RDollarsAnd CentsEa 162.000 93 677 6001 Elim Ext Pav Mrk & Mrks (4")DollarsAnd CentsLf 31,678.000 94 678 6001 Pav Surf Prep For Mrk (4")DollarsAnd CentsLf 28,398.000 95 678 6004 Pav Surf Prep For Mrk (8")DollarsAnd CentsLf 2,960.000 96 678 6006 Pav Surf Prep For Mrk (12")DollarsAnd CentsLf 1,235.000 97 678 6008 Pav Surf Prep For Mrk (24")DollarsAnd CentsLf 35.000 98 678 6009 Pav Surf Prep For Mrk (Arrow)DollarsAnd CentsEa 11.000 99 678 6016 Pav Surf Prep For Mrk (Word)DollarsAnd CentsEa 9.000 100 678 6023 Pav Surf Prep For Mrk (36")(Yld Tri)DollarsAnd CentsEa 34.000 101 678 6024 Pav Surf Prep For Mrk (Med Nose)DollarsAnd CentsEa 1.000 102 3076 6002 D-Gr Hma Ty-B Sac-B Pg64-22DollarsAnd CentsTon 9,360.000 103 3077 6027 Sp Mixes Sp-C Sac-A Pg70-28DollarsAnd CentsTon 4,061.000 104 6001 6002 Portable Changeable Message SignDollarsAnd CentsEa 2.000 105 6185 6002 002 Tma (Stationary)DollarsAnd CentsDay 260.000 106 6185 6005 002 Tma (Mobile Operation)DollarsAnd CentsDay 15.000 107

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents