Last Updated | 10/13/2023 05:33 PM |
Project Title | ATC Welding Lab Expansion Re-Bid |
Physical Address | View project details and contacts |
City, State (County) | Greensburg, KY 42743 (Green County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $6,200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. This branch of the work includes coordination with all utility companies; agency review fees and all inspection fees; all labor, materials, tools, excavation and backfill and all equipment necessary for the installation of all Heating, Ventilating and Air Conditioning, System as shown on the Drawings and Specifications and/or as required for complete and operating systems. The work shall include starting, balancing, and the necessary and required tests to insure the proper operation of the complete system. B. All work for this project must comply and be in strict accordance with the Kentucky Building Code, Kentucky Plumbing Code, Kentucky Boiler Code, NFPA, ADA, NEC and all local codes and regulations. C. In general (as a minimum) all materials and equipment must be installed in strict accordance with manufacturer's requirements; and provided with all required controls, internal fusing, relays, piping connections, electrical connections, ductwork connections, etc., to provide for complete and operable systems. Renovations - Phase 3, at Green Co. High School ATC in Greensburg, Kentucky 2017 BG22-192 Bid Security equal to 5% of Base Bid will be required, in the form of a Bid Bond, Cashier's Check, or Certified Check. Questions or requests for clarification shall be directed to the Architect. The Owner reserves the right to reject any and all bids or to waive any informalities in the bidding. No bid may be withdrawn without the consent of the Owner or forfeit of Bid Security for a period of thirty (30) days subsequent to the date for receipt of bids Addendum #1-#7 have been issued as of 4-19-2023. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |