Similar Projects
Facilities Mandarin Water Reclamation Facility (WRF) Building 5 Exhaust Fan Upgrade
Infrastructure
Bidding
$200,000 est. value
Jacksonville, FL 32257

Air Conditioning Filter Replacement
Alteration
Bidding
Jacksonville, FL

HVAC and Mechanical Products
Term Contract
Post-Bid

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Facilities HVAC Integrated Preventative Maintenance Services
Results
Jacksonville, FL 32212

Air Conditioning Filter Replacement
Term Contract
Results
FL

J-- Request for Heating Ventilation an Cooling (HVAC) Piping Removal and Repair.
Post-Bid
Mayport, FL

HVAC Replacement and Repair
Results
Jacksonville, FL 32218

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Exhaust Fans
Results
Jacksonville, FL

HVAC Service
Infrastructure
Post-Bid
Jacksonville, FL 32212

Rooftop Unit (RTU) Replacement
Results

Wall-Hung Heat Pumps
Alteration
Post-Bid
Jacksonville, FL

Purchase, Replace and Upgrade the Computer Room Air Conditioning (CRAC)
Results
Jacksonville, FL 32218

Building 45 Fume Hood Replacement
Results
Less than $174,178 est. value
Jacksonville, FL 32224

Reported 06/16/2022 12:00 AM
Project Title

Facilities HVAC Upgrade for Air Handler Units at Ridenour

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32225   (Duval County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Request for Proposal (RFP) is to evaluate and select a vendor that can provide economical pricing for HVAC upgrade service for three (3) Air Handler Units (AHUs) located at Ridenour, 102 Kernan Blvd, Bldg. #1, Jacksonville, FL 32225. Upgrade service include but are not limited to remove existing AHU-1, AHU-2, and AHU-3; install new JEA purchased YORK AHUs; modify piping; modify electrical; provide new duct heaters; install UV lights (shipped loose); provide 120V circuit for the UVs; modify duct work; replace corroded outdoor air duct to AHU-1 and AHU-2; insulate duct work.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents