Similar Projects
Asphalt Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Concrete Maintenance Work Order Contract
Alteration
Design
$1,000,000 est. value
WA

Parks Hall Selective Emsc Replacement
Renovation
Bidding
$475,000 CJ est. value
Everett, WA 98201

Concrete Burial Liners
Term Contract
Sub-Bidding
Bellingham, WA 98229

Precast Concrete Products - Value Blanket
Alteration
Post-Bid
Spokane, WA

Trees and Concrete Upgrade
Alteration
Post-Bid
$285,000 est. value
Clarkston, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Kelsey Creek Picnic Shelter Paving
Infrastructure
Results
$15,000 est. value
Bellevue, WA 98005

Rebid Green Lake Community Boathouse
Demolition, Renovation, Infrastructure
Construction
$8,367,000 CJ est. value
Seattle, WA 98103

DR0515 Repair Fairway 15
Term Contract
Design
$5,000,000 est. value
WA

Russell Creek Project
Alteration
Post-Bid
WA

3rd Street SW And Lea Hill Bridge Deck Preservation
Renovation, Infrastructure, Alteration
Results
$700,000 to $900,000 est. value
Auburn, WA 98092

Gustaves Manor Envelope Upgrade
Renovation
Design
$3,446,000 CJ est. value
Auburn, WA 98002

Main Canal Polyurea
Alteration
Post-Bid
Ephrata, WA 98823

Concrete Pavement Repair Project
Infrastructure
Results
Washougal, WA 98671

Last Updated 01/06/2023 04:04 PM
Project Title

Fish Trap Creek Culvert Replacement at Cormorant Bay Road

Physical Address View project details and contacts
City, State (County) Deer Harbor, WA 98245   (San Juan County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $691,930 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This contract provides for furnishing and installing a new precast concrete box culvert beneath Cormorant Bay Road to enhance fish passage in Fish Trap Creek on Orcas Island, San Juan County, WA. Work includes stream diversion; clearing and grubbing with tree and stump removal; construction of a temporary bypass road; roadway excavation and disposal; installation of a precast box culvert; placement and compaction of gravel roadway base; installation of guardrails; asphalt paving; channel reconstruction and habitat restoration; and other work, all in accordance with the Contract Plans, Contract Provisions, and the WSDOT Standard Specificationsfor Road, Bridge, and Municipal Construction, 2022 edition. Bidders are cautioned that delivery service to San Juan Island issubjectto delays due to inclement weather and ferry service disruptions. Bidders who send their bids to San Juan County via USPS, Fed Ex, UPS or some other carrier shall place their bids in a sealed envelope, to ensure that a sealed bid is received by the County. Any Addenda to the Contract Provisions and Plans will be posted online. Only Bidders who have notified San Juan County Public Works that they are interested in supplying a quote will be notified of Addenda. Notification will be made using the contact information provided by the bidder. In accordance with Standard Specification 1-02.4(1): Oral explanations, interpretations, or instructions given by anyone before the Award of a Contract will not be binding on San Juan County. Any information given a prospective Bidder concerning any of the Bid Documents will be furnished to all prospective Bidders as an Addendum if that information is deemed by San Juan County to be necessary in submitting Bids or if San Juan County concludes that the lack of the information would be prejudicial to other prospective Bidders. Bid deposit shall be submitted with each bid by check or money order, in the amount of 5% of the bid amount, or a bid bond in lieu of deposit. San Juan County reserves the right to accept or reject any or all bids in the best interest of the County. Bids will be subject to review and compliance with specifications. The successful bidder must meet all the mandatory bidder responsibility criteria set forth in RCW 39.04.350 and will be required to carry and maintain a minimum of $1 million in liability insurance coverage throughout the period of the contract, in accordance with County policy. Steel and iron construction material that is permanently incorporated into the project shall consist of American-made materials only. All permits have been obtained for this project and any relevant provisions for the bidder have been included in the contract provisions and plans This contract is subject to WAC 458-20-171 (Rule 171) for tax purposes, and the bidder shall include for compensation the amount of any taxes to be paid in the various unit bid prices or other contract amounts (1-07.2(1) APWA GSP June 27, 2011). The successful bidder shall provide executed payment and performance bonds for the full contract amount, in accordance with RCW 39.08.010. Pursuant to RCW 60.28.011, a sum of 5% of the monies earned by the Contractor will be retained from progress payments. Contact the Public Works Department at (360) 370-0500. Notice of U.S. DOT Title VI Assurances: "San Juan County, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award." (LAG Manual 46.2.24)

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents