Similar Projects
The Rejuvenation Station- Health & Wellness Spa
New Construction, Demolition
Conception
Biloxi, MS

Airport Site Development
Infrastructure
Conception
Gulfport, MS

Beau Rivage Resort and Casino
Renovation
Design
Biloxi, MS 39530

Aqua Suites Biloxi Boutique Hotel
New Construction
Design
$32,000,000 est. value
Biloxi, MS 39530

Veterans Boulevard
Infrastructure
Bidding
$2,000,000 CJ est. value
Gulfport, MS 39503

Veterans Boulevard
Infrastructure
Bidding
$2,176,046 CJ est. value
Gulfport, MS 39503

Repair and Maintenance Unit Price Project
Infrastructure
Post-Bid
Gulfport, MS

CTA Tram, Bike & Pedestrian Bridge
Infrastructure
Post-Bid
$200,000 CJ est. value
Gulfport, MS 39501

Cotton Compress Site Improvements
Infrastructure
Results
$1,095,732 est. value
Gulfport, MS

Hiller Park Boat Launch Improvements
Infrastructure
Results
$448,560 CJ est. value
Biloxi, MS 39531

Jiffy Lube / D'iberville
New Construction, Infrastructure - 3,438 SF
Construction
$1,500,000 CJ est. value
Diberville, MS 39540

The Bella Condominiums
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Biloxi, MS 39530

Holiday Inn / Biloxi
Build-out
Pending Verification
Biloxi, MS 39531

Brantley Ellison Fitness / Biloxi
New Construction, Infrastructure
Conception
Biloxi, MS 39532

Residence Inn by Marriott
New Construction
Design
Biloxi, MS 39530

Last Updated 10/31/2022 01:33 PM
Project Title

Flamingo Beach Inn & Comfort Inn/Choice Hotels Redevelopment

Physical Address View project details and contacts
City, State (County) Biloxi, MS 39531   (Harrison County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected May 2021 , Construction documents
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new hotel and renovations to the existing hotel at the site. As of November 4, 2020, the project is on hold until construction prices are lower. The project has received planning approvals but construction documents have not been submitted yet. A general contractor has not yet been selected. A firm construction timeline has not been set.

Details

New Construction, New Construction. Renovation, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents