Similar Projects
Electrical Upgrades, Birch Hill and Tully Lake Dams
Design
$500,000 to $1,000,000 est. value
Royalston, MA

RRFB Pedestrian Crossings Signals
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Sterling, MA 01564

200-1 Complete Electrical Upgrade Project
Renovation
Sub-Bidding
$782,781 CJ est. value
Clinton, MA 01510

Electrical and Door Work Parking Garage
Alteration
Post-Bid
Leominster, MA 01453

2021/2022 Utility Pole and Anchor Replacements
Alteration
Post-Bid
$50,000 est. value
West Boylston, MA

New Electrical Service
Results
Less than $848,000 est. value
Worcester, MA

EV Charging Stations
Alteration
Results
Fitchburg, MA

Emergency Lights - Stairwells
Alteration
Post-Bid
$53,000 est. value
Millbury, MA 01527

Roof Fan Replacement at Memorial and Reingold Schools - SUB Bid
Alteration
Results
Fitchburg, MA 01420

Underground Repairs for Nodes 27 and 28
Alteration
Post-Bid
Shrewsbury, MA 01545

Replace Emergency Lights
Alteration
Results
$41,767 est. value
Dudley, MA 01571

Replace Condensing and Evaporator Coil and Related Piping and Electrical Work
Alteration
Post-Bid
$15,000 est. value
Dudley, MA

Electrical
Alteration
Results
$350,985 est. value
Milford, MA

Photovoltaic Systems and Associated Equipment Maintenance, Repair, and Upgrade
Alteration
Post-Bid
$343,000 est. value

Generator Maintenance and Repair
Term Contract
Results
$66,900 est. value
Westborough, MA 01581

Last Updated 04/27/2023 12:05 AM
Project Title

Purchase and Installation of Two Electric Vehicle Charging Stations

Physical Address View project details and contacts
City, State (County) Auburn, MA 01501   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $24,878 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 24, 2022. Project has been awarded to Commonwealth Electrical Technologies amounting $24,877.50 **Estimated Budget is between $10,000 and $50,000. The total project cost should not exceed the $50,000 amount. Request for Quote - Purchase and Installation of two Electric Vehicle Charging Stations at Town Hall, 104 Central Street Auburn, MA 01501. The Town of Auburn is requesting quotes for the purchase and full installation of two CoRE+ L2 Charging Stations (or a comparable dual port electric vehicle charging station) at Auburn Town Hall, 104 Central Street. The Town will be applying to the Massachusetts Department of Environmental Protection (MassDEP), Massachusetts Electric Vehicle Incentive Program (MassEVIP) for costs associated with the purchase and installation of two EV Charging Stations. The Town is specifically applying for the Public Access Charging (PAC) Program. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents