Similar Projects
Little Scholars Academy
Renovation - 2,895 SF
Design
Huntersville, NC 28078

Ardrey Kell Rd
Bidding
$1,088,000 est. value
Charlotte, NC

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Arden, Asheboro, Asheville, Belmont, Chapel Hill, Charlotte, Fayetteville, Greensboro, Kernersville, Lenoir, Reidsville, Rockingham, Troutman, NC

Grey Road Sidewalk and Storm Drainage Improvements
Post-Bid
$500,000 est. value
Davidson, NC 28036

Little Sugar Creek Greenway and Stream Enhancement Project, I-485 to Polk Street
Results
Pineville, NC 28134

Southpark Enhanced Crosswalks - Phase 1
Results
Less than $761,000 est. value
Charlotte, NC

Cross Charlotte Trail - Davidson to Matheson
Post-Bid
$859,000 est. value
Charlotte, NC

McDowell Creek Greenway Project Phase 1A
Results
$1,600,000 to $1,700,000 est. value
Charlotte, NC

Ashley Road Sidewalk
Results
Less than $1,300,000 est. value
Charlotte, NC

Joint Duct Bank Relocation
Results
$200,000 to $400,000 est. value
Charlotte, NC

Peachtree Hills Sidewalks
Results
$1,137,000 est. value
Charlotte, NC

Cross Charlotte Trail - 7th Street to 10th Street Connector
Results
$1,736,000 est. value
Charlotte, NC 28206

Oneida Road Sidewalk and Culvert Replacement
Results
$1,712,000 est. value
Charlotte, NC 28206

Sidewalk Gaps and Ramps FY21
Results
$979,660 est. value
Charlotte, NC 28206

Pedestrian Safety FY21
Results
Less than $2,340,800 est. value
Charlotte, NC 28206

Last Updated 02/07/2020 10:58 AM
Project Title

Minor Transportation Projects FY20 Packet A

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $431,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of three separate project locations: 1. Wilkinson Boulevard Sidewalk Gap project will fill in the existing gaps of sidewalk along Wilkinson Boulevard. 2. Wilkinson Left Turn Lane Extension will extend the available vehicle storage in the existing outbound left turn lane along Wilkinson Boulevard at Old Steele Creek Road. 3. Queen City Sidewalk Project will construct new sidewalk on Queen City Drive. Overall work will include minor grading, sidewalk, curb and gutter, pipework, accessible ramps, milling, asphalt paving, thermoplastic pavement markings, and related activities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents