Similar Projects
1800 North Sewer Realignment
Post-Bid
Salt Lake City, UT 84116

Sewer Cleaning
Post-Bid
Price, UT

800 West - 600 South to 800 South
Results
Less than $7,925,018 est. value
South Jordan, UT

2021 Off-Line Sewer Gravel Trap
Results
Less than $174,390 est. value
Cedar City, UT 84720

Richfield City Sewer Lagoon Improvements and Sewer Collection Pipe Upgrades
Post-Bid
Richfield, UT

FY 2019-20 Sewer Rehabilitation Project
Results
$200,000 to $250,000 est. value
Pleasant Grove, UT 84062

Sanitary Sewer Replacement on 5175 South and 1150 West Streets
Post-Bid
$145,500 est. value
Riverdale, UT 84405

Bybee Drive Improvement
Results
UT

Construction of the Redwood Road 2021 Improvements
Infrastructure
Post-Bid
Taylorsville, UT

2020 Sewer Pipe Liners
Results
$1,400,000 to $1,600,000 est. value
Orem, UT

Morgan Airport Utility Project
Infrastructure
Post-Bid
Morgan, UT 84050

Trenchless Storm and Sanitary Sewer Rehabilitation
Results
Less than $600,000 est. value
Ogden, UT

Millcreek Substation to 3050 East Sewer Outfall Project
Infrastructure
Post-Bid
Santa Clara, UT

Sewer Line Camera Inspection Services
Results
Orem, UT

Traverse Transmission Line Improvement Project
Infrastructure
Post-Bid
Draper, UT

Last Updated 04/25/2022 04:10 PM
Project Title

Video and Cleaning of Sewer Mains at Zion NP

Physical Address View project details and contacts
City, State (County) Springdale, UT 84767   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall conduct Cleaning and Video Inspection of Parks 44,500 feet of Sewer Mains. Areas of work to include: Grotto, Lodge Complex, Watchman and Oak Creek Housing, South and Watchman Campground, Visitor Center and all other Facilities attached to Canyon Sewer System. Sewer lines will be cleaned manhole to manhole to include from the Zion National Park Lodge to the Town of Springdale sewer manhole located in the Zion Canyon Campground at 479 Zion Park Blvd. Manhole pipe entrances and exits will be inspected as part of camera work. Sewer Collection System piping consists of approximately 6,320ft. of 4”main, 11,570ft. of 6”main, 26,150ft of 8”main and 510ft. of 12”main. There are approximately 141 Manholes.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents