Similar Projects
Force Main Replacement Project
Bidding
$4,500,000 est. value
Abington, MA

Purchase of Ductile, Cast Iron, and Steel Fittings
Term Contract
Post-Bid
Brockton, MA

Fire Hydrants
Term Contract
Post-Bid
Brockton, MA 02301

2019 PCE Water Main Replacement
Results
Less than $1,750,000 est. value
Duxbury, MA

Raynor Avenue - Water Main Replacement
Results
Less than $190,000 est. value
Whitman, MA

Water Materials and Supplies
Term Contract
Post-Bid
Marshfield, MA

Construction of the Mill Street (Route 6) Water Main
Results
Less than $2,200,000 est. value
Marion, MA

Constructing a Water Line
Post-Bid
Carver, MA

Low Flow Toilets
Results
Less than $48,000 est. value
Pembroke, MA

Furnishing and Installing 3 Replacement Hydrants
Post-Bid
$48,200 est. value
Marion, MA 02738

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Main Replacement Phase 4B
Post-Bid
$1,850,000 est. value
Scituate, MA

Repair Work to the Twin 24-Inch Diameter Water Transmission Mains
Results
Less than $35,000 est. value
Brockton, MA 02301

Water Meters/Reading Equipment
Term Contract
Results
Hanover, MA

Water Distribution Materials and Supplies
Term Contract
Results
Hanover, MA

Last Updated 11/07/2019 07:13 AM
Project Title

Construction of Nemasket River Water Main Crossing at Wareham Street

Physical Address View project details and contacts
City, State (County) Middleborough, MA   (Plymouth County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000
Plans Available from Municipal Agency - 09/25/19 until 10/16/19
Owner View project details and contacts
Architect View project details and contacts
Description

For each well, includes, but is not limited to the relocation of approximately 325 feet of 12-in. PVC pressure pipe watermain and related work. The work includes modifications to the existing stone masonry wall along Wareham Street, which spans the Nemasket River, reinforced concrete work, installation of watermain supports and relocation of the existing PVC pipe along the southerly edge of the masonry stone wall. The work also includes installation of watermain insulation and protective cover over the watermain and putting the watermain back into service.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Division 31 - Earthwork, Excavation and Fill, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents