Similar Projects
Last Updated | 07/03/2021 03:19 AM |
Project Title | Camp Vits Bridge Supply and Install |
Physical Address | View project details and contacts |
City, State (County) | Manitowoc, WI (Manitowoc County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Pedestrian Bridges Supply and Installation–Work consists of manufacturing and installing four 8-foot-wide pedestrian bridges along a scenic trail system throughout Camp Vits Park on the outskirts of the City of Manitowoc. Two bridges will be 26’ long and two will be 38’ long. All four bridges will have 54” horizontal safety railings on both sides spanning the entire length of the bridge. |
||||||||||||||||||||
Details | Bridge, New Construction.
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |