Similar Projects
Pedricktown Disposal Area Complex
Design
$5,000,000 to $10,000,000 est. value
Pedricktown, NJ

Drainage Pipe
Term Contract
Bidding
Randolph, NJ

Parking Lot and Drainage Improvements at Lincoln Park Middle School
Post-Bid
$351,488 est. value
Lincoln Park, NJ 07035

Precast Concrete Culvert
Post-Bid
Morristown, NJ 07960

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Veterans Park Culvert Replacement
Post-Bid
Parsippany, NJ 07054

Drainage Improvements to Hibernia Avenue
Results
Rockaway, NJ 07866

John Street Drainage Improvements
Post-Bid
East Hanover, NJ 07936

Drainage, Curb and Sidewalk Improvements at Various Locations 2020 General Services Program
Results
Convent Station, NJ 07960

Reconstruction of Various Streets in Mount Tabor, Phase V
Post-Bid
Parsippany, NJ 07054

Drainage Restoration Contract, Statewide -2019
Results
$5,000,001 to $10,000,000 est. value

Millbrook Avenue Retaining Wall Project
Post-Bid
Randolph, NJ 07869

Replacement of Knox Hill Road Culvert at Fosterfields Living Historical Farm
Results
Morristown, NJ 07960

Olympia Drive Drainage Improvements
Post-Bid
East Hanover, NJ 07936

Last Updated 09/24/2021 04:51 PM
Project Title

Pedricktown Disposal Area Complex

Physical Address View project details and contacts
City, State (County) Pedricktown, Picatinny Arsenal, NJ (Morris, Salem Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Pedricktown Area Complex (hereinafter, "the Complex") of dredged material disposal areas are comprised of a system of earthen dikes with approximately 1800 acres of contaminated space designed to hold dredged materials. The Complex is located in Salem County, New Jersey. The contract work will consist of providing all management, tools, supplies, equipment and labor necessary to provide drainage and earthwork preparation services at the Complex. Phase 1 consists of excavating drainage ditches along the inside perimeter of the disposal area, constructing “Finger drainage ditches” to aid in drainage and drying, maintaining drainage flow and stockpiling material in the disposal area in a manner which promotes drying. Phase 2 requires the contractor to move, push-up and place on-site material to raise the elevation of the existing disposal area and proposed lay down limits, and move, shape and compact dredged materials within the lay down limits of the existing earthen dike. Contractor is required to stockpile materials inside the disposal area in a manner that enhances the drying process and provides dry, workable materials after rain events.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents