Similar Projects
RFQ Design - Ballistic Architectural Upgrades
Renovation
Conception
$189,200 CJ est. value
University Park, TX 75225

Stults Road Elementary School Renovation
Renovation
Conception
$10,000,000 est. value
Dallas, TX 75243

Wisdom Academy Phase I
New Construction - 12,600 SF
Design
$1,000,000 est. value
Carrollton, TX 75006

Vertical Construction Multiple Award Task Order Contract - Service Disabled Veteran Owned
New Construction
Design
$2,500 to $102,100,000 est. value

Geneva Heights Elementary School - Addition/Renovation
Addition, Demolition, Infrastructure, Renovation
Bidding
$30,986,820 CJ est. value
Dallas, TX 75206

ORG 216 Edward Titche ES-Renovation - Completed CSP Package Part 2
Renovation
Bidding
Dallas, TX 75227

CDCC Structural Steel
Term Contract
Sub-Bidding
Dallas, TX 75202

ORG 216 Edward Titche ES-Renovation - Completed CSP Package Part 1-A, 1-B and 1-C
Renovation
Sub-Bidding
$1,318,882 CJ est. value
Dallas, TX 75227

Career Institute North at Walnut Hill
New Construction
Post-Bid
Dallas, TX 75229

SW Professional Building TTUHSC Dallas
Renovation
Post-Bid
Dallas, TX 75216

Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Task Order Contract For Construction, Repair, And Alteration With Design-Build And Incidental Abatement For Gsa/Pbs Region 7
Renovation
Results
$2,000 to $3,500,000 est. value

Construction Management at Risk - Multiple Projects Package 2019-2
Addition
Results
Mesquite, TX 75150

Cannaday Elementary School Addition
Addition
Construction
Mesquite, TX

Tom Gooch Elementary School - Addition and Renovation
Renovation, Addition
Construction
$6,733,813 est. value
Dallas, TX 75244

Blair Elementary School Improvements
Renovation
Pending Verification
Farmers Branch, TX 75234

Last Updated 08/15/2022 01:02 PM
Project Title

Newcomer Intake Center and Canyon Creek Elementary School Renovation (Multi-Campus Daycare Projects)

Physical Address View project details and contacts
City, State (County) Richardson, TX 75081   (Dallas County)
Category(s) Education, Government/Public
Sub-Category(s) Elementary School, Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,330,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK A. All Division 21 sections of these specifications shall include all labor and material to complete the entire fire suppression systems as specified and shown on the Drawings. All work shall be fully compliant with NFPA 13, 14, 24 Owner's Insurance Carrier and Local Authority having jurisdiction. B. All work shown and specified shall be completely installed and connected by mechanics properly qualified to perform the work required. All work shall be left in a satisfactory operating condition as determined by the Owner and Owner's Representative. C. Provide all services and perform all operations required in connection with, or properly incidental to, the construction of complete and fully operating systems with all accessories as herein specified and shown on the Drawings. D. Refer to "Conditions of Work" in Division 1 Richardson ISD will accept proposals for Multi Campus Daycare construction projects. PROPOSAL BOND: A Proposal Bond from a bonding company acceptable to the Owner or a certified check in an amount equal to 5 percent (5%) of the greatest amount of proposal must accompany each offeror's proposal. PAYMENT BOND AND PERFORMANCE BOND: A Payment Bond and Performance Bond, each in an amount equal to 100 percent (100%) of the Contract Sum conditioned upon the faithful performance of the Contract will be required. Please note that all bonding companies presented must be acceptable to the Owner. The prevailing rates of wages are the minimums that must be paid in conformance with all applicable laws of the State of Texas. The Owner reserves the right to reject any and all proposals and to waive any irregularities in the Competitive Sealed Proposal process. No proposal shall be withdrawn within 30 days after the proposal opening without the specific consent of the Owner.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents