Similar Projects
Sandy River Road Self Storage
New Construction
Conception
Axton, VA

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

FY22 USACE LRD Regional Construction Management Services Multiple Award Task Order Contract (MATOC)
New Construction, Renovation, Term Contract
Post-Bid
$200,000,000 to $300,000,000 est. value
Chicago, IL

Air Force Targeting Center
New Construction - 94,800 SF
Results
$25,000,000 to $100,000,000 est. value
Hampton, VA

Fire Apparatus and Quartermaster Storage Facility
New Construction - 7,214 SF
Results
$1,000,000 to $5,000,000 CJ est. value
Suffolk, VA 23434

Shirley Industrial Park - Distribution Center Warehouse
New Construction - 138,460 SF
Construction
$4,000,000 to $5,000,000 est. value
Springfield, VA 22151

ARW Warehouses
New Construction
Pending Verification
Colonial Heights, VA 23834

General Building Trade Contract
Renovation, Term Contract
Post-Bid
Stafford, VA

RFP D/B - Design and Construction of New Police Station
Demolition, New Construction, Infrastructure, Renovation - 29,500 SF
Post-Bid
$12,500,000 CJ est. value
Williamsburg, VA 23185

Reported 09/15/2022 12:00 AM
Project Title

Virginia Department of Military Affairs (VDMA) Fort Pickett 561 Conversion of Warehouse to Joint Force Headquarters Building

Physical Address View project details and contacts
City, State (County) Blackstone, VA 23824   (Nottoway County)
Category(s) Commercial, Government/Public
Sub-Category(s) Military Facility, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Conversion of Warehouse to Joint Force Headquarters (JFHQ) at Fort Pickett - Blackstone, VA. VAFM PN 20-0003 The project is generally described as the renovation of the existing warehouse 561; consisting of demolition of the existing building down to the primary structural elements, and construction of new building envelope, interior office and administrative spaces, storage and support spaces, utilities and systems, and sitework, as indicated in the Contract Documents. A Commonwealth of Virginia Standard Performance Bond (DGS-30-084, form CO-10) and a Commonwealth of Virginia Standard Labor and Material Payment Bond (DGS 30-088, form CO-10.1) WILL be required regardless of the bid amount. A 5% Bid Bond is required. No other forms of security, including certified checks, will be accepted.

Details

Military Facility, New Construction, Warehouse/Storage, New Construction.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents