Similar Projects
Watermark at Fort Collins
New Construction
Conception
$7,000,000 est. value
Fort Collins, CO 80521

Affordable Housing Apartment Community
New Construction - 8,000 SF
Conception
Gunbarrel, CO 80301

Montava
New Construction
Design
Fort Collins, CO 80522

Masonic Lodge
Renovation
Design
$250,000 est. value
Rifle, CO

Springstone
New Construction - 260,000 SF
Post-Bid
Colorado Springs, CO 80901

Cortez Senior Center Tenant Improvement
Post-Bid
Cortez, CO 81321

Olde Town At Parker
New Construction - 1,309 SF
Construction
$850,000 est. value
Parker, CO 80134

Lodge at Black Forest Phase ll
New Construction - 375,358 SF
Construction
$10,000,000 est. value
Colorado Springs, CO 80908

Springs at Pena Station
New Construction
Pending Verification
Denver, CO 80249

Cinquefoil Lane Apartments
New Construction
Pending Verification
Fort Collins, CO 80528

Kaleidos
New Construction
Conception
Colorado Springs, CO 80916

Apex III Apartments
New Construction - 5,822,790 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Parker, CO 80112

2020 Salida Community Center Reconstruction
Post-Bid
Less than $106,000 est. value
Salida, CO 81201

Apex Meridian Phase II
New Construction - 180,000 SF
Construction
$10,000,000 est. value
Lone Tree, CO

The Lock At Flatirons
New Construction - 407,724 SF
Pending Verification
Broomfield, CO 80021

Last Updated 07/01/2021 01:54 PM
Project Title

Ellen Hansen Smith Center Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Paonia, CO   (Delta County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Installation of new kitchen floor. 2. Replacement and/or relocation of sinks. 3. Replacement and/or repair kitchen cabinets. 4. Addition of a wall to provide a secondary access to the building. 5. Replacement of existing OSB walls and ceiling as needed. 6. Other repairs as outlined and needed following on-site visit.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents