Similar Projects
Lewis Park Shelter Building Replacement - 15-049 - City of Edina
Demolition, New Construction, Infrastructure
Conception
$900,000 CJ est. value
Edina, MN 55435

New Fire Station No. 11 - FIR11 - City of Minneapolis
New Construction, Infrastructure
Conception
$9,144,000 CJ est. value
Minneapolis, MN 55414

The Cubes at French Lake
New Construction, Infrastructure - 996,960 SF
Design
$537,000,000 CJ est. value
Dayton, MN 55327

Rivers Edge Assisted Living
New Construction, Infrastructure - 28,598 SF
Design
$8,000,000 CJ est. value
Brooklyn Park, MN 55443

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

P143 Intelligence Center
Addition, Demolition, Build-out, Renovation, Infrastructure - 9,200 SF
Post-Bid
$15,000,000 CJ est. value
Minneapolis, MN 55450

Minneapolis College Kopp Hall Skyway Renovation
Renovation
Results
$1,600,000 CJ est. value
Minneapolis, MN 55403

2022 Creek Valley Site Improvements
Infrastructure
Results
Edina, MN

Bhatti GI Surgery Center
Demolition, New Construction, Infrastructure - 40,032 SF
Construction
$15,000,000 CJ est. value
Minneapolis, MN 55435

Bde Maka Ska Refectory
New Construction, Infrastructure - 9,890 SF
Construction
$6,225,700 CJ est. value
Minneapolis, MN 55408

Cornelia View Apartments
Infrastructure, Renovation
Pending Verification
$33,000,000 CJ est. value
Minneapolis, MN 55435

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

Duck Lake Trail (Dell Rd. to CR 4) - PE-8083 - City of Eden Prairie
Infrastructure
Conception
$3,390,000 CJ est. value
Eden Prairie, MN 55346

Tessman Ridge Apartments
New Construction, Infrastructure - 126,470 SF
Design
$20,400,000 CJ est. value
Brooklyn Park, MN 55445

Walgreens #16279 / Minneapolis
New Construction, Infrastructure - 75,000 SF
Post-Bid
$20,000,000 CJ est. value
Minneapolis, MN 55406

Last Updated 07/07/2023 12:05 PM
Project Title

Hennepin Technical College-Brooklyn Park Campus HVAC Lab Expansion

Physical Address View project details and contacts
City, State (County) Brooklyn Park, MN 55445   (Hennepin County)
Category(s) Education, Heavy and Highway, Laboratory
Sub-Category(s) College/University, Laboratory, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $605,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 7, 2023, the project has not been awarded. A timeline for award has not been confirmed. The HVAC Lab Expansion remodels 6,500 gsf of existing interior building space at Hennepin Technical College - Brooklyn Park Campus. The project includes minor demolition and remodeling of existing space for a new HVAC program lab, and the relocation of the Electronics program lab. The project includes related plumbing, HVAC, electrical, and fire and sprinkler modifications for the remodeled area. Site Directions: Park in the visitor parking lot for pre-bid meeting Pre-Qualification: Yes THE PROJECT COVERS RENOVATION OF INTERIOR BUILDING SPACE OF APPROXIMATELY 6,500 SQUARE FEET, INCLUDING MINOR DEMOLITION AND RELATED MECHANICAL AND ELECTRICAL WORK. THE HVAC LAB/SHOP PROGRAM WILL EXTEND TO AND REMODEL THE EXISTING ADJACENT ELECTRONICS LAB/SHOP AREA, ROOMS D170-174. THE ELECTRONICS LAB/SHOP WILL RELOCATE AND REMODEL ROOMS E150-154 AND D176. The Contractor shall also set in place and provide all mechanical and electrical power connections for furnaces, condensing units and heat pumps furnished by the OWNER. B. The Work covers construction and completion of the Project as shown on the Drawings and as specified in the Project Manual. The work shall be sequenced to complete construction in the Phase 1A and Phase 1B work areas noted on the drawings. C. Prime Contractor under a direct contract with the Owner will complete all Work. D. Overall coordination of the Project will be the responsibility of the Prime Contractor. E. The Owner will occupy the adjacent existing facilities and be conducting regular programs during the entire time of the Project. The Contractor shall take all necessary precautions to maintain the existing Owner's activities and cooperate with the Owner in all construction Work to minimize conflict with Owner program requirements. 1.02 SCOPE A. The Contractor shall supply all labor, materials, transportation, apparatus and tools necessary for the entire proper completion of this Work: and shall install, maintain and remove all equipment for the proper execution of the Contract, and shall be responsible for the safe, proper and lawful performance of their equipment, maintenance use of the same, and shall perform in the best manner, and everything properly incidental thereto, as stated in the Contract Documents or reasonably implied therein.

Details

2 Stories Above Grade, 6,500 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Laboratory Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents