Similar Projects
Intersection Improvement with Flashing Lights and Lighting Upgrades in Fulton County
Infrastructure
Results
IL

D4 Fulton County Asphalt
Infrastructure
Results
IL

Processing Modified Soil, HMA Resurfacing, Aggregate Shoulders, Box Culvert Extension and the Construction of a Box Culvert
Results
IL 61441

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

Bituminous Materials
Infrastructure
Post-Bid
Astoria, IL

Pavement Patching
Infrastructure
Post-Bid

Bituminous Materials
Results
Less than $75,862 est. value
Lewistown, IL

Pavement patching
Infrastructure
Results
Canton, IL

HMA Resurfacing
Alteration
Results
$275,523 est. value
Canton, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

HMA Resurfacing and Miscellaneous Concrete
Infrastructure
Results
Farmington, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

2021 Roadway Improvements - Kenneth Lane
Infrastructure
Post-Bid
Avon, IL

RR-21-4821 Pavement Repairs
Infrastructure
Results

Last Updated 05/04/2022 04:25 AM
Project Title

Red Ember Remedial Reclamation

Physical Address View project details and contacts
City, State (County) IL   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Red Ember Remedial Reclamation Project is for the restoration of burnout and eroded areas at the Red Ember abandoned mine site by the Illinois Department of Natural Resources using federal abandoned mined lands funds. The project site is located approximately ¾ mile south of Fiatt, Illinois approximately ¾ mile east of North State Route 97 off of East Tompkins Road in Sections 29, 32, and 33,Township 7 North, Range 3 East, Fulton County, Illinois. A voluntary pre-bid meeting is scheduled for this project at 10:30 a.m., Thursday, April 14, 2022. All interested potential bidders are to meet near the intersection of East Arrow Road and East Tompkins Road near the project site. A pre-bid meeting location map is attached. 25100115 Acre Mulch, Method 2 Base Items 11.600 28100805 Ton Stone Dumped Riprap, Class a3 Base Items 300.000 Nrm20110 l Sum Special Clearing Base Items 1.000 Nrm20210 Cu Yd Earth Excavation Base Items 20,715.000 Nrm20230 Cu Yd Mine Refuse Excavation Base Items 14,524.000 Nrm21626 Ton Ca Fill, Ca6 Base Items 146.000 Nrm25040 Pound Nitrogen Fertilizer Nutrient Base Items 1,392.000 Nrm25050 Pound Phosphorus Fertilizer Nutrient Base Items 1,160.000 Nrm25060 Pound Potassium Fertilizer Nutrietnt Base Items 4,060.000 Nrm25070 Ton Agricultural Ground Limestone Base Items 23.200 Nrm25090 Acre Seeding Base Items 11.600 Nrm25510 Ton Mine Refuse Treatment - Limestone Base Items 5.200 Nrm28040 Foot Perimeter Erosion Barrier Base Items 1,080.000 Nrm67110 l Sum Mobilization Base Items 1.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents