Reported | 03/20/2020 12:00 AM |
Project Title | Field Root Zone Renovations Raymond James Stadium |
Physical Address | View project details and contacts |
City, State (County) | Tampa, FL 33607 (Hillsborough County) |
Category(s) | Single Trades |
Sub-Category(s) | Landscaping/Irrigation |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor will be responsible for removing and capping all existing sprinkler heads/swing joints, as well as providing protection for all on field irrigation/electrical valve boxes. Contractor shall survey the entire field, establishing 9” cut/remove grade stakes 11” above the gravel layer. Contractor shall remove all existing sod/root zone soil from the field (approximately 9” in depth or 3000 cubic yards of undisturbed soil), leaving 11” of undisturbed soil above the gravel layer. All soil removal from the field will be disposed of on site. Contractor will install 3” of USGA construction sand (approximately 1400 tons) evenly across the entire field. Contractor will mix sand using a soil cement mixer, into 6” of existing root zone soil. After the soil mixing procedure is complete, the root zone soil will be compacted and rough graded to within .01” |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |