Similar Projects
Fulmer Road Collection System Extension
New Construction
Bidding
$2,270,000 est. value
PA

Rodeway Inn Pump Station Replacement Project
New Construction
Bidding
Bedford, PA

Shiloh Pump Station Materials
Post-Bid
State College, PA 16801

Flowers Road Pump Station Construction General/Mechanical
Post-Bid
Derry, PA 15627

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Commercial Iron Shop and In-Field Services at Transfer Stations 1 & 3
Renovation
Results
Chester, PA

Sixth and Canal Pump Station Phase II Upgrade Project - Contract 1 - General Construction
Construction
$6,000,000 to $8,500,000 est. value
Reading, PA 19601

Maple Grove Sewage Pumping Station and Interceptor Expansion - General Construction
Construction
$1,400,000 est. value
Lancaster, PA 17603

Wastewater Treatment Plant Project - General/Process Mechanical
New Construction, Alteration
Bidding
$7,225,000 est. value
Reinholds, PA

Jeannette Sewage Treatment Plant Pump Station Upgrade General / Mechanical Construction
Post-Bid
New Stanton, PA 15672

Pump Station Replacements - Clark and Walton Streets Project
Results
Less than $250,000 est. value
Lemoyne, PA 17043

East Halls Pump Station Upgrades
New Construction, Demolition
Construction
$1,980,000 est. value
University Park, PA

Sewer Extension North of I-81
New Construction
Bidding
Mechanicsburg, PA

Tanker Filling Station
Post-Bid
Renovo, PA

Pump Station No.1 Interceptor Sewer Lining and Manhole Repair Project
Results
$151,901 est. value
Carlisle, PA 17013

Last Updated 01/18/2022 12:20 PM
Project Title

Abrams Pump Station/Valley Brook Pump Station/ Trout Run Main Pump Station Equipment Replacement - General Construction

Physical Address View project details and contacts
City, State (County) King of Prussia, PA 19406   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $650,000 to $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Abrams Pump Station: Replace six (6) 16-inch motor actuated plug valves with six (6) new 16-inch motor actuated plug valves; Replace two existing 12-inch flow meters with new 12-inch flow meters; Provide and install one (2) new paperless chart recorders with dual flow capability. Valley Brook Pump Station: Remove and replace the two (2) existing submersible pumps and motors with two (2) new submersible pumps and motors; Replace approximately 20 feet of 4-inch ductile iron discharge piping; Remove the existing motor starts and install two (2) new motor starters for each pump. Trout Run WPCC Main Pump Station: Remove one (1) existing influent pump and motor and replace it with a new dry-pit submersible wastewater pump. Install one (1) new VFD control for the new pump. Replace approximately 15 feet of discharge piping.

Details

Lift and Pump Stations, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 11 - Equipment, Common Work Results for Equipment, Common Motor Requirements for Equipment.
Division 22 - Plumbing, Plumbing Piping, Facility Storm Drainage, Sump Pump Discharge Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents