Similar Projects
A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

A/E Services For The Risk Management Center Which Includes Projects Within The United States And Its Territories For Dam And Levee Safety And Other Work As Assigned To Usace
Design
$15,000,000 est. value

National Architecture/Engineering/Interiors (IDIQ) Contract
Bidding
Less than $25,000,000 est. value

National Architecture/Engineering/Interiors (IDIQ) Contract
Bidding
Less than $25,000,000 est. value

C--A-E IDIQ for Facilities Maintenance and Sustainment Support and Engineering work predominantly in the NAVFAC AOR Worldwide
Post-Bid
Less than $90,000,000 est. value

C--A-E IDIQ for Facilities Maintenance and Sustainment Support and Engineering work predominantly in the NAVFAC AOR Worldwide
Post-Bid
Less than $90,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

C--IDIQ Contract for Architect-Engineer Services for Design and Engineering Services for Industrial Type Facilities Located Throughout the Naval Facilities Engineering Command AOR, Worldwide
Results
Less than $95,000,000 est. value

A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Post-Bid
$25,000 to $100,000,000 est. value

C--Parking Lot Topography Survey for the Stratton VA Medical Center
Results
Albany, NY 12208

Request for Information AE Next Pool 2 Architect-Engineering Services for Design and Construction Support for the Air Force Construction Program
Post-Bid

Geotechnical Engineering Services
Results
$500,000 to $2,000,000 est. value

Miscellaneous Architect/Engineer Services in Support of Facilities Programs
Post-Bid
$1,000 to $3,000,000 est. value

USCG Ocean Architect/Engineering IDIQ MATOC
Results
$3,500 to $2,500,000 est. value

Last Updated 10/04/2021 01:58 PM
Project Title

C1DA--528A8-18-801 Design Renovate for Vir-Cardiac Cath

Physical Address View project details and contacts
City, State (County) Albany, NY   (Albany County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes design and construction period services for replacing the air cooled chillers currently used to serve critical AHUs at the Albany VAMC including OR, PACU, ICU, and Cath Lab. The goal of the project is to improve the reliability of this backup chilled water system. The equipment to be replaced includes: two (2) 165 ton split chillers with air cooled condensers. The related refrigerant piping, chilled water pumps and piping, and controls will be modified as necessary to provide a reliable and efficient system. The proposed chillers shall each have a minimum of two compressors, be capable of variable primary chilled water flow and be capable of operating with outdoor temperatures ranging from -10F to 95F. The existing chillers are located in the sub-basement Rm. S-22. The existing air cooled condensers are located on the roof of a 1st floor addition. The OR chillers use a separate chilled water piping system to serve the critical AHUs listed above with a manual changeover between chilled water supplied from a central plant to chilled water provided by the OR system. The OR chillers and CHW system is typically only used when the outdoor air temperature exceeds 50F and the central plant is offline (winter, loss of power, etc.). Emergency power is currently supplied to the OR chillers and related primary pumps using automatic transfer switches. The chiller controls however need to be re-configured to have service from emergency power. The OR chillers are currently monitored and enabled by the hospitals BMS.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents