Similar Projects
MUNI - Dev Plan - Overlook at Kennerly Lake Lot 33A - Taylor Morrison Of Georgia Llc.
New Construction, Infrastructure
Design
$104,166 CJ est. value
Rocky Face, GA 30740

MUNI - Dev Plan - Overlook at Kennerly Lake Lot 33A - Taylor Morrison Of Georgia Llc.
New Construction, Infrastructure
Design
$104,166 CJ est. value
Rocky Face, GA 30740

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Miscellaneous HDPE Conduit - Materials Only
Infrastructure
Post-Bid
Dalton, GA

Dalton City 11 Substation Site Preparation
Infrastructure
Post-Bid
Dalton, GA

New Driver Services Center - DALTON
New Construction, Infrastructure - 8,010 SF
Results
$2,360,000 CJ est. value
Dalton, GA 30721

Varnell Elementary School Paving
Results
Dalton, GA 30721

Essentia Protein Solutions Broth Factory
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Dalton, GA 30720

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

2021 Milling and Resurfacing of Various City Streets
Infrastructure
Results
Dalton, GA

Dalton Parks and Recreation Playground Unit
Infrastructure
Post-Bid
$40,000 CJ est. value
Dalton, GA 30720

5.8 T Riverbend Road at SR 3 Improvements and Signal Modification
Infrastructure
Results
Dalton, GA 30721

Springhill Heights and Pine Valley S/D Sewer Expansion Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Dalton, GA 30720

Agriculture Meter Installation
Infrastructure
Results

RFP Construction Manager at Risk - Renovations and Additions to the John Davis Recreation Center
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Dalton, GA 30721

Last Updated 12/08/2022 09:06 AM
Project Title

Apron Pavement Rehabilitation - Phase 2

Physical Address View project details and contacts
City, State (County) Dalton, GA 30721   (Whitfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Apron Pavement Rehabilitation - Phase 2 the Work Will Consist of, but is Not Limited to, Removal and Replacement of Existing Asphalt Pavement Adjacent to the Airport Terminal Building, Replacement of Existing Underground Storm Sewer Piping, and Placement of Airfield Pavement Markings. The Location of the Work is at the Dalton Municipal Airport, Dalton, Georgia.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents