Similar Projects
Medical District Drainage Tunnel Extension at Ehrhardt Street
Bidding
$10,000,000 est. value
Charleston, SC 29425

Drainage Improvements - US 76 (Marion Co)
Infrastructure
Bidding
SC

District 2 On-Call Pipe Repair
Post-Bid

District 2 On-Call Pipe Repair
Post-Bid

Rosa Lane Drainage Improvement Project
Results
Greenville, SC 29601

FY20 Clouter Creek North Cell Ditching
Results
$500,000 to $1,000,000 est. value
Charleston, SC 29403

Pipe Cleaning and Lining
Post-Bid
Columbia, SC 29202

Maplewood Drive Culvert Replacement
Results
Lyman, SC 29365

Phase 3 Internal Drainage Improvements
Post-Bid
Isle of Palms, SC 29451

USDA-FS Sumter NF Culvert FSR 665A Replacement
Results
$25,000 to $100,000 est. value
Edgefield, SC 29824

Huger Street and King Street Intersection Drainage Improvements Project
Post-Bid
Charleston, SC

Precast Reinforced Concrete Floorless Culvert-Arch Box Type
Results
Pickens, SC 29671

Campus Village Residential Development - South Tunnel Stabilization
Post-Bid
$600,000 to $800,000 est. value
Columbia, SC 29208

Installation of Drainage System in Playground Area
Results
Florence, SC 29063

Wells Japanese Garden Pond Renovation
Post-Bid
Newberry, SC 29108

Reported 12/08/2021 12:00 AM
Project Title

Water and Wastewater System Improvements

Physical Address View project details and contacts
City, State (County) Whitmire, SC   (Newberry County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Water Plant improvements will generally involve the replacement of valves, transmitters, and a SCADA RTU, installation of controllers. Wastewater Plant improvements include replacement of aerators and valves, clarifier rehabilitation, and new liquid disinfection facilities. Calhoun St. 2” water line replacement. Questions concerning the project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents