Similar Projects
Phase 3 West Lynn Sewer Separation Project
New Construction
Bidding
$34,000,000 est. value
Lynn, MA

Wastewater Pump Station Capital Improvements - General Bids
Renovation
Bidding
$1,500,000 est. value
Stoughton, MA

Mizaras Well Pump Station
New Construction
Sub-Bidding
$2,700,000 est. value
Middleborough, MA

School Street Pump Station Odor Control - Sub Bid
Renovation
Sub-Bidding
$980,000 est. value
Agawam, MA 01001

Construct New West Peabody Pump Station - Sub Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Construct New West Peabody Pump Station - General Bid
New Construction - 3,800 SF
Post-Bid
Less than $425,000 est. value
Peabody, MA

Sewage Lift Station Replacement
Results
Less than $250,000 est. value
Boston, MA

Permanent COMM Connection Project
Results
$334,000 est. value
Hyannis, MA 02601

Downtown Area Collection System and Pumping Stations
Construction
$13,000,000 est. value
Orleans, MA 02653

D'Angelis Water Treatment Plant PFAS Upgrades - General Bids
New Construction, Infrastructure
Bidding
$5,000,000 est. value
Millis, MA

Sewer Pump Station Maintenance and Repairs
Post-Bid
Lexington, MA

Rose Park Pump Station Upgrades - General Bids
Results
$637,688 est. value
Pittsfield, MA 01201

Hill Street Booster Pump Station
Infrastructure
Bidding
$1,700,000 est. value
Foxborough, MA 02035

2020 Pump Station Improvements Project - General Bids
Post-Bid
$1,250,000 est. value
Weymouth, MA

Lincoln Avenue Pump Station Upgrade Project - Phase II
Results
Less than $800,000 est. value
Saugus, MA 01906

Last Updated 02/01/2022 10:16 AM
Project Title

Hockanum Flood Control Pump Station Phase 1 Upgrades - General Bids

Physical Address View project details and contacts
City, State (County) Northampton, MA 01060   (Hampshire County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The work consists of demolition of existing electrical service, equipment, underground fuel storage tanks, and installing new electrical service, motor control center, wiring, above ground fuel storage tanks, sanitary sewer service with grinder pump, and rooftop fall protection anchor point. Work includes site restoration.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents