Similar Projects
Pre-Qualified Contractors for Construction - Related - SOJO
Infrastructure
Bidding
South Jordan, UT

Lee Drain Bank Stabilization-Piping of Canal at Pioneer Road
Infrastructure
Bidding
$977,100 est. value
Salt Lake City, UT 84129

Segmented Pipe Liner
Term Contract
Post-Bid
UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Cottonwood Heights Recreation Improvements Project
Results
Cottonwood Heights, UT 84121

I-80; Culvert Rehabilitation
Results
$1,277,955 est. value

Jordan Valley Water Treatment Plant Basins 3-6 Sedimentation Basins Upgrades
Infrastructure
Bidding
$17,000,000 to $22,000,000 est. value
Riverton, UT 84065

Uintah Indian Irrigation Project
Term Contract
Post-Bid
$471,000 est. value

Local Strees Reconstruction 2021 #1
Results
Less than $2,383,000 est. value
Salt Lake City, UT

Stormwater Inlet Grate
Infrastructure
Post-Bid
Riverton, UT

2021 Trails Shoulder Maintenance
Results
Draper, UT

Roundabout 1300 East and Pioneer Road
Infrastructure
Post-Bid
Draper, UT 84020

Complex MS4 Project
Term Contract
Results
Taylorsville, UT 84129

2022 CIPP Rehabilitation Project
Infrastructure
Post-Bid
$500,000 est. value
Bluffdale, UT

900 East Pioneer Road to 12200 South Widening Project
Results
Draper, UT 84020

Reported 06/23/2022 12:00 AM
Project Title

Causeway Breach Berm Modification

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Services to raise the breach invert berm in the bottom of the breach channel by approximately four feet to further cut off and reduce the flows of the high salinity waters into the South Arm. Work will also include armoring the north side of the raised invert berm with large riprap. The procurement item will be the contractor's services to furnish and place rock materials in the breach channel, as identified in the drawings and specifications. The estimated amount of rock needed is 450 to 500 cubic yards. This contract will result in one contract award to the lowest cost responsive and responsible bidder.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents