Similar Projects
Last Updated | 12/02/2022 10:02 AM |
Project Title | JEFCOED Kitchen Hood Renovations Bagley ES, Gardendale ES, McAdory ES |
Physical Address | View project details and contacts |
City, State (County) | Birmingham, AL 35233 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Sub-Bidding Closed, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $60,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | JEFCOED Kitchen Hood Renovations for Bagley, Gardendale, and McAdory Elementary Schools. The work includes the replacement of the existing Kitchen Exhaust Hood associated exhaust duct and exhaust fan. There will also be new mechanical equipment to provide HVAC to the existing kitchen space. The utility curb for the equipment under the hood will be replaced with a stainless steel prefabricated UDS. A cashier's check or bid bond payable to Jefferson County Board of Education in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. The Owner intends to award multiple or single contracts for this work to pre-qualified General Contractor(s). The Owner will accept proposals only from firms which demonstrate their experience and ability to perform the work necessary for this project. Interested General Contractors must submit a Contractor's Qualification Statement, AIA A305. Minimum qualifications to be certified by prospective bidders include: 1) statutory licensor requirements, 2) bonding capacity in excess of $5,000,000 dollars, 3) minimum of five (5) years successful history as an approved, authorized or licensed General Contractor, 4) successful current experience in construction of a size and scope similar to this Project, and 5) submit list of proposed contractor's team including subcontractors. Joint venture arrangements must qualify solely on the strength of the principal firm's qualifications. Notarized Contractor's Qualification Certificates must be submitted to the Architect along with any request to obtain Bid Documents by a General Contractor by Tuesday, October 11th, 2022. The required Form of Certificate is AIA Document A305 Contractor's Qualification Statement 1986 Edition and may be obtained from the Architect. Bidder's Requests for Information. Send via e-mail to wbradford@turnerbatson.com. All RFI's are to be sent prior to 3 business days of the bid date (October 27th at 2:00 pm). Bids must be submitted on proposal forms furnished by the Architect (Engineer) or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect (Engineer); the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. Project No. 22085U02GES |
||
Details | 2 Stories Above Grade, 19,000 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |