Similar Projects
Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Centennial Trail Improvement
Results
Kersey, CO

Pennock Trail Bridge Replacement
New Construction
Results
Less than $80,000 est. value
Walden, CO 80480

GMUG National Forest Prefabricated Glue Laminated Bridge Deck
New Construction
Post-Bid
Telluride, CO 81435

East 112th Avenue Over Fulton Ditch Bridge Replacement
New Construction
Results
Commerce City, CO 80022

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Kechter Bridge Over I-25 Including Roadway and Retaining Walls - Bid Package 9
New Construction
Results
CO

Stunner Bridge Repair
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Creede, CO

North Cheyenne Canon Fiberglass Trail Bridges
New Construction, Infrastructure
Results
$60,000 to $75,000 est. value
Colorado Springs, CO

Roadway Widening and Reconstruction
New Construction, Infrastructure
Post-Bid
$5,000,000 to $20,000,000 est. value
CO

Bridge Maintenance Program
New Construction, Infrastructure
Results
Broomfield, CO

Bridge Repair Project West 44th Avenue over Clear Creek
Renovation, Infrastructure
Post-Bid
Wheat Ridge, CO 80215

Ford Park Pedestrian Bridge Rehabilitation
Infrastructure
Results
$100,000 to $150,000 est. value
Vail, CO

Bridge Maintenance Program
Renovation
Post-Bid
Broomfield, CO

Last Updated 06/30/2022 10:24 AM
Project Title

Donovan Park Pedestrian Bridge Deck Rehabilitation

Physical Address View project details and contacts
City, State (County) Vail, CO 81657   (Eagle County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing bridge deck and installation of new bridge deck on the pedestrian bridge over Gore Creek near Donovan Park, with a span length of approximately 76' and 10'-3" deck width.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents