Similar Projects
Odor Control Installations for Pump Stations 072, 109 & 183 (Pid# 003239A)
Results
$422,100 est. value
FL

Walk-In Cooler/Freezer Replacement
Results
Clearwater, FL 33761

Polymer Preparation and Feed System
Results
Clearwater, FL 33760

Chiller Replacement Starkey Elementary
Results
Seminole, FL 33777

Cooling Tower Replacement Northeast High School
Results
Saint Petersburg, FL 33703

Grizzle Building, Replace Generator, Chiller Pumps, and Air Handling Units
Results
$2,000,000 est. value
Largo, FL

J--Copy of Service: Visn 8 Boiler Safety Device Testing, Program Development and Training
Results
Bay Pines, Cape Coral, Gainesville, Lake City, Miami, Orlando, Tampa, West Palm Beach, FL - San Juan, PR

H--Service: Mechanical Backflow Prevention Evaluation (Cross Connection Survey)
Results
Bay Pines, FL 33744

Generator
Post-Bid
Largo, FL 33771

Boiler Maintenance Replacements
Post-Bid
Less than $230,000 est. value
Saint Petersburg, FL 33701

Restoration of Bicentennial Fountain at South Straub Park
Results
Saint Petersburg, FL 33701

Roofing and Mechanical Renovations at Tomlinson Adult Learning Center
Results
Saint Petersburg, FL 33701

Directions for Living
Post-Bid
Clearwater, FL 33764

Walk-In Cooler/Freezer Replacement
Post-Bid
Saint Petersburg, Seminole, FL

Boiler Maintenance and Repair
Term Contract
Bidding
Clearwater, Largo, Saint Petersburg, FL 33778

Last Updated 01/24/2019 10:24 AM
Project Title

J--St Petersburg Chiller Plant Maintenance

Physical Address View project details and contacts
City, State (County) Saint Petersburg, FL   (Pinellas County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The St Petersburg VARO is in need of awarding a service contract for the management and maintenance of the MCP to include all system components, pumps, fans, VFD's, electric distribution system, AC units (2), exhaust system, fire suppression system, hazardous gas system, filtration system, communications, communication panels, valves (automatic and manual), and all other components not listed as well as maintaining the overall cleanliness of the MCP and surrounding area inside of the MCP complex.
Details
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Fire Detection and Alarm.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents