Last Updated | 09/14/2022 11:33 AM |
Project Title | Recreational Sports Facility (RSF) HVAC Controls Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Berkeley, CA 94720 (Alameda County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $350,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | LICENSE REQUIREMENTS: The successful Bidder will be required to have the following California current and active contractor's license at the time of submission of the Bid: "C-20" - Warm-Air Heating, Ventilating and Air-Conditioning Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. The work described in the contract is a public work subject to section 1771 of the California Labor Code. No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Bidder shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour) and shall comply with all applicable federal, state and local working condition requirements. Conversion of existing Barrington building HVAC pneumatic controls system to direct digital control systems Automated Logic (ALC). Base Bid Scope includes the following but not limited to: Controls upgrades for existing HVAC equipment on main Gym (high) Roof. (4) Air Handling Unit with return fan- AHU-1, AHU-2 AHU-3, AHU-4 - Install new DDC control panel with associated sensors. (4) Air Handling Unit - AHU-5, AHU-6, AHU-7, AHU-8 - Install new DDC control panel (8) Exhaust Fans - EF-1 through 8 - Start/Stop and status. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |