Similar Projects
New Intermodel Commuter Facility
New Construction
Conception
$54,000,000 est. value
Newton, MA 02460

Tempone Apartments Site Improvements Projects - Asphalt Walkway Replacements and Concrete Panel and Granite Curbing Replacements
Post-Bid
$14,000 est. value
Medford, MA

Site/Paving Contractors
Post-Bid
Less than $38,750 est. value
Newton Highlands, MA 02461

Mercier Center Exterior Rehabilitation
Results
$512,243 est. value
Lowell, MA 01854

North Common Village Site Improvements
Results
$199,883 est. value
Lowell, MA 01854

922 Massachusetts Avenue Renovation
New Construction, Renovation
Construction
Cambridge, MA 02139

Green at UTEC
New Construction
Construction
Lowell, MA 01852

St. Andrews Episcopal Church Solar Canopy
Alteration
Pending Verification
Framingham, MA 01702

Squannacook Greenways Trail
New Construction, Renovation
Post-Bid
$100,000 est. value
Townsend, MA

South Common Village Site Improvements
Results
Less than $748,000 est. value
Lowell, MA 01854

FBO Terminal
New Construction, Demolition - 6,000 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Bedford, MA

Site Improvements - Corbett Apartments
Results
$152,557 est. value
Somerville, MA 02145

133 West Union Street Site and Restoration
Post-Bid
$30,000 to $35,000 est. value
Ashland, MA 01721

Early Site Prep Woburn Fire Department
Results
Woburn, MA 01801

Land Clearing Management
Post-Bid
Hanscom A F B, MA

Last Updated 07/22/2021 04:39 PM
Project Title

Exterior and Site Improvements, Oliver Greenwood 667-1 - General Bids

Physical Address View project details and contacts
City, State (County) Billerica, MA 01821   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $492,731
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The Project consists of: Concrete entry walkways, painting exterior metal, painting exterior wood trim, wood trim repairs/replacements, metal railing replacement, exterior shutter replacement, light fixture replacements, and related work including ACM abatement.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Environmental Assessment, Demolition, Selective Demolition, Asbestos Remediation, Asbestos Abatement.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 05 - Metals, Metal Railings, Pipe and Tube Railings.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Miscellaneous Rough Carpentry, Finish Carpentry, Exterior Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Joint Sealants.
Division 09 - Finishes, Painting, Exterior Painting.
Division 10 - Specialties.
Division 26 - Electrical.
Division 31 - Earthwork, Earth Moving.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents