Similar Projects
Grading, Drainage, Paving, and Structure
New Construction, Infrastructure
Bidding
$2,000,000 est. value
Greensboro, NC 27497

Deep River Pond Maintenance
Term Contract
Post-Bid
High Point, NC 27265

Reroof, Clean Gutters, Install Gutter Guards, and New Downspout Drainage at The Oaks
Infrastructure, Alteration
Post-Bid
Greensboro, NC

Grading, Paving, Shoulder Construction and Culvert on SR 2835 Mcknight Mill Rd in Guilford County
Results
Greensboro, NC 27405

Replace Pipe 40 20112 on SR 2735 (Sockwell Road)
Results
NC

Horse Pen Creek Greenway- Pedestrian Trail Culvert
Infrastructure
Post-Bid
$130,000 est. value
Greensboro, NC 27410

Polypropylene Pipe
Results

Burnt Poplar Road Culvert Upgrade
Infrastructure
Post-Bid
$200,000 est. value
Greensboro, NC 27409

Eugene and Bellemeade Streetscape
Infrastructure
Results
$2,600,000 est. value
Greensboro, NC

Corrugated Aluminized Pipe
Infrastructure
Results
McLeansville, NC 27301

Grading, Paving, Shoulder Construction, Guardrail and Culvert - Replace Pipe #40 226 On Sr 2930 (Bethel Church Road) 0.8 Mi. e. Jcy. Sr 2819
Infrastructure
Results
NC

Corrugated Metal Pipe, Plain
Infrastructure
Results
McLeansville, NC 27301

Grading, Paving, Water Line, Shoulder Construction And Culvert - Replace Pipe# 78 2137 On Sr 1501 (Garrett Rd) 0.1 Mi W. Jct. Sr 1553 (Rhodes Rd)
Infrastructure
Results
NC

Corrugated Metal Pipe, Plain
Infrastructure
Results
High Point, NC 27265

Arboretum Stream Restoration
Infrastructure
Results
$1,000,000 est. value
Greensboro, NC

Last Updated 06/10/2022 12:35 AM
Project Title

425 Evergreen Avenue French Drain

Physical Address View project details and contacts
City, State (County) High Point, NC 27262   (Guilford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will provide all necessary materials, labor and equipment to complete installation of an interior French drain system to include one (1) I/2 horsepower sump pump, new moisture barrier and water diverting methods to gutter downspouts at 425 Evergreen Ave, High Point, NC 27260.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents