Similar Projects
New Elementary School
New Construction
Conception
$34,000,000 est. value
West Haven, UT

2022 Bond Renovation & Construction Projects
New Construction, Renovation
Conception
Alpine, UT

Lakeview Business Park
New Construction
Design
$1,500,000,000 est. value
Tooele, UT 84074

Ben Lomond Golf Course Mixed Use
New Construction - 40,836 SF
Design
Harrisville, UT 84414

Government Center Campus Reconstruction and Site Development
Renovation, Infrastructure
Bidding
Salt Lake City, UT 84115

Beehive Clothing Mills Site Improvements
Alteration
Bidding
Salt Lake City, UT 84104

Oakdale Elementary Office Remodel
Post-Bid
Sandy, UT 84093

Mountain Life Church Expansion
New Construction, Addition - 45,956 SF
Post-Bid
Park City, UT 84098

Ferron and Huntington Creek Stabilization
Results
Castle Dale, UT 84513

Airport Glycol Plant / Wildlife Office Space
Results
Less than $3,170,000 est. value
Salt Lake City, UT 84116

Turner Mill Mixed Use
New Construction - 125,000 SF
Construction
$10,000,000 CJ est. value
Heber City, UT 84032

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Sky Mountain RV Park
New Construction - 5,328 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Hurricane, UT 84737

Antelope Animal Hospital Parking Expansion
New Construction, Alteration
Pending Verification
Syracuse, UT 84075

Roosevelt Elementary School Rebuild
New Construction
Conception
$37,000,000 est. value
Washington Terrace, UT

Reported 04/13/2022 12:00 AM
Project Title

Sally Mauro Elementary Site Improvements

Physical Address View project details and contacts
City, State (County) Helper, UT 84526   (Carbon County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Clearing and Grubbing, new parking lot construction, seal coat existing asphalt parking lot, sidewalk, curb and gutter, ADA ramp, concrete stairs, chain-link fencing, paint striping, trench drain and parking lot lighting. Bid alternates to remove and replace existing asphalt pavement section.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents