Similar Projects
Last Updated | 07/28/2022 07:03 PM |
Project Title | Firestone - Traffic Signal and HAWK Signal |
Physical Address | View project details and contacts |
City, State (County) | Firestone, CO 80520 (Weld County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Sewer and Water |
Sub-Category(s) | Maintenance, Roadway Lighting, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Town of Firestone is seeking Bids for: 1) Traffic Signal location at Colorado Blvd and Kings Soopers access (approximately 670 south of Firestone Blvd): Installation of traffic signal poles and mast arms, signal heads, pedestrian signals and push buttons, signage, pavement markings, and associated wiring and equipment. Traffic control, resident notification (Vehicle Message boards), and Stormwater BMP compliance are required. All Towns Standards and Specifications are to be followed. 2) HAWK Signal location at Colorado Blvd and Oak Meadows Blvd: Installation of HAWK signal poles and mast arms, signal heads, pedestrian signals and push buttons, signage, pavement markings, and associated wiring and equipment. Traffic control, resident notification (Vehicle Message Boards), and Stormwater BMP compliance are required. All Towns Standards and Specifications are to be followed. Question Acceptance Deadline 06/16/2022 06:00 PM EDT Questions are submitted online No A. Contractor shall complete all Work and perform all Services which are described or reasonably implied from the Scope of Work set forth in Exhibit A and the Contract Documents, attached hereto and incorporated herein by this reference and known as: Firestone - Traffic Signal & HAWK Signal (S2022-9226). B. A change in the Scope of Work shall not be effective unless authorized as a written amendment to this Agreement or change order in accordance with the Contract Documents. If Contractor proceeds without such written authorization, Contractor shall be deemed to have waived any claim for additional compensation, including a claim based on the theory of unjust enrichment, quantum meruit or implied contract. Except as expressly provided herein, no agent, employee, or representative of the Town is authorized to modify any term of this Agreement, either directly or implied by a course of action. C. Within 10 days of the Effective Contract Date, Contractor shall provide the performance bond and labor & material payment bond and certificate of insurance required by the contract Documents. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |