Similar Projects
Resurfacing
Infrastructure
Bidding
$500,000 est. value
Atwood, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Douglas County Township Roadway Improvements
Post-Bid
Tuscola, IL

2.579 Miles of Cape Seal Operations from ILL130 South to ILL 49
Results

4.79 Miles of Shoulder Repairs on IL 133 from Caldwell Road to Vine Street in Arthur and on Caldwell Road from CR 1900N to 1200' North of CR 1700N
Results
Arthur, IL 61911

Pulverization (1330 SYD), Aggregate Base Repair
Post-Bid
Newman, IL

11.36 MI of Patching Along FAI 57 from S of Arcola to N of Tuscola
Results
Arcola, Tuscola, IL

Bituminous Surface Treatment
Infrastructure
Post-Bid
Arthur, IL

Douglas County Township Roadway Improvements
Alteration
Results
Tuscola, IL

2021 General Maintenance
Infrastructure
Post-Bid
Tuscola, IL

Road Resurfacing
Infrastructure
Results
Tuscola, IL

Street Surface Processing and Materials Furnish and Install Project
Infrastructure
Post-Bid
$70,000 est. value
Arthur, IL

Seal Coat
Infrastructure
Results
Villa Grove, IL

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

43.69 Miles of Pavement Marking on i-55 from Sugar Creek
Infrastructure
Results

Last Updated 06/22/2022 05:51 AM
Project Title

CM Shoulder Repair from Vine St in Arthur to CR 100 E of Arthur

Physical Address View project details and contacts
City, State (County) IL   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

40600290 Pound Bituminous Materials (Tack Coat) Base Items 4,066.000 44000158 Sq Yd Hot-mix Asphalt Surface Removal, 2 1/4" Base Items 9,036.000 67100100 L Sum Mobilization Base Items 1.000 70107025 Cal Da Changeable Message Sign Base Items 30.000 X4823105 Ton Hot-mix Asphalt Shoulders, Special Base Items 1,140.000 X7010216 L Sum Traffic Control and Protection, (Special) Base Items 1.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents