Similar Projects
Generators Maintenance/Service Agreement
Term Contract
Post-Bid
Lindon, UT

Primary Wire U/G
Post-Bid
Provo, UT

Lehi Power Substation Transformers
Results
Lehi, UT

Dfcm Construction-Pre Qualified Electrical-Ev Car Charging Stations Prove Area Ph. III-20351300
Results
Less than $250,000 est. value
Provo, UT

Resistograph Power Pole Testing
Post-Bid
Springville, UT

Lone Peak High Auditorium Lighting Upgrade
Results
Highland, UT 84003

138Kv Air Break Switches - Mountain Vista Substation
Post-Bid
Provo, UT

Ridgecrest Elementary School DayLighting Project
Results
American Fork, UT 84121

Covey Center Main Hall House Lighting / Control Upgrade
Post-Bid
Provo, UT

Willowcreek Middle School (Theatrical Lighting Upgrade)
Results
Lehi, UT 84043

Electric Transmission/Distribution Hardware Material
Term Contract
Post-Bid
Provo, UT 84606

DFCM Construction - Electrical Contractors - UVU Campus Lighting Upgrade
Results
$100,000 est. value
Orem, UT 84097

Distribution Transformers
Term Contract
Post-Bid
Provo, UT 84601

Provo Regional Center Transformers and Switch Gear Replacement
Results
Less than $350,000 est. value
Provo, UT

Christmas Light Installation Service
Term Contract
Post-Bid
Orem, UT

Last Updated 11/13/2019 09:31 AM
Project Title

Bull River Substation - Transformer T1 Replacement Construction

Physical Address View project details and contacts
City, State (County) Lehi, UT   (Utah County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bull River Substation Scope of Work includes all necessary site preparation, storm water management and debris management and containment throughout construction, grading and fill (Contractor is responsible for supplying placing, compacting, and grading fill material), any required relocation or installation of drainage piping to tie into existing site drainage. The contractor is responsible for installation, adjustment, placement and testing of all Owner and Contractor provided electrical equipment, structural steel, concrete foundations, grounding equipment, above and below grade conduit (including feeder getaway conduits to ground sleeves), and finish rock for a complete and functioning facility. The contractor is responsible for the removal of existing T1 transformer and regulators and modification of existing foundation and secondary containment within the substation yard, the new transformer is currently in the process of procurement. The contractor is responsible for the installation of new transformer and all additional primary, secondary, control and grounding connections to this equipment and tie in to the existing circuit switcher and lowside switch structure. All conduit, foundations, fiberglass grating and grounding attachment points are included in this scope. Removal of the existing low side rigid bus and associated connections are to be replaced with new 3” rigid bus and new connections to existing low side voltage transformers and switches are included in this scope.

Details

Division 26 - Electrical, Substations.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents