Project Title | New Melones Generator Rewind |
Physical Address | View project details and contacts |
City, State (County) | Sonora, CA 95370 (Tuolumne County) |
Category(s) | Single Trades |
Sub-Category(s) | Equipment |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $28,708,564 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Aug 26, 2022 Contract Award Number: 140R2022C0015 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: TWA8Z4ANM3Y4 Contractor Awarded Name: GE RENEWABLES US LLC Contractor Awarded Address: , CO 80111-4765 USA Base and All Options Value (Total Contract Value): $28708564 All solicitation questions shall be emailed to both Matthew Thomas (mthomas@usbr.gov) and Todd Dooley (tdooley@usbr.gov) by close of business on Tuesday, May 10, 2022 Safety Attire/PPE's: Hard toed boots, long sleeve shirts and pants, hand sanitizer and personal drinking water recommended. COVID-19 considerations: Comply with instructions and maintain safe distances, using masks/shields when social distancing is difficult to maintain. A. New Melones Power Plant Generator Rewind B. Work Site Location: Work is located at New Melones Powerplant approximately 50 miles east of Stockton, CA and 10 miles southwest of Sonora, CA in Calaveras County. C. Site Visit Information: See Section L, FAR 52.236-27, Site Visit (Construction) - Alt. 1. D. Estimated Price Range: $20,000,000.00 to $30,000,000.00. E. Set-aside Information: This requirement is an unrestricted procurement using NAICS Code 237990 and applicable size standard $39.5 Million. Video Surveillance System: 1. Payment: Lump sum prices offered in Price Schedule A and Price Schedule B. 1.02 SUBMITTALS A. Submit the following in accordance with Section 01 33 00 - Submittals and Section 01 33 26 - Electrical Drawings and Data B. RSN 28 23 00-1, Video Surveillance System: 1. Manufacturer's technical data 2. Camera and housing outlines 3. Camera mounting details, location and drawings 4. Video terminal details 5. Installation and wiring instructions 6. Programming and operating instructions C. RSN 28 23 00-2, Video Surveillance Final Data: 1. Compiled time lapse photographs on DVD discs. TrueLook 1080P Robotic PTZ Camera or approved as equal with the following salient characteristics: 1. Minimum of 1080P resolution 2. Minimum of 10 x optical zoom 3. Minimum of 60 deg. Horizontal view and 35 deg. Vertical view 4. 360 deg. Robotic rotation of camera 5. Powered by standard 110V AC The Pan / Tilt / Zoom (PTZ) camera shall provide live feed video to monitor construction activities. C. The PTZ camera shall take time lapse photographs for all work within the generator bore for each day of construction. Time lapse photographs shall be taken at no less than 15 minute intervals during onsite work hours. Time lapse photographs shall be accessible from web-based site. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (19.8%), WBE (6.9%) |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |