Similar Projects
Digester #2 Structural and Mechanical Rehabilitation - City of San Clemente
Renovation
Conception
$500,000 CJ est. value
San Clemente, CA 92672

Headworks Grit Cyclone Replacement - City of San Clemente
Renovation
Conception
$600,000 CJ est. value
San Clemente, CA 92672

Water Reclamation Plant (WRP) Odor Control Systems Replacement - City of San Clemente
Renovation
Design
$6,500,000 CJ est. value
San Clemente, CA 92672

Cengen Cooling Water Pipe Replacement at Plant No. 2
Renovation
Bidding
$3,445,021 CJ est. value
Huntington Beach, CA 92646

Cengen Smoke Detection Improvements at Plant No. 1 and No. 2
Renovation
Bidding
$314,000 CJ est. value
Fountain Valley, CA 92708

Primary Sedimentation Basins No. 6-31 Reliability Improvements at Plant No. 1
Renovation
Post-Bid
$7,900,000 est. value
CA

Thickening and Dewatering Building Pipe Support Improvements at Plant No 1
Renovation
Post-Bid
$1,000,000 est. value
Fountain Valley, CA

Rebuild Shop Fume Extractor Installation at Plant NO 1
Renovation
Results
$234,000 est. value
CA

WRP Sodium Hypochlorite Tank Replacement
Renovation, Infrastructure
Results
$394,614 CJ est. value
San Clemente, CA 92672

Primary Clarifier 1,2 and 3 Rehabilitation - City of San Clemente
Renovation
Conception
$500,000 CJ est. value
San Clemente, CA 92672

Irvine Desalter Project Principal Aquifer Plant (PAP) and Shallow Groundwater Unit (SGU) Optimization for PFAS Treatment
Renovation
Bidding
$6,700,000 CJ est. value
Irvine, CA 92618

Trickling Filter Sludge and Scum Pumps Replacement at Plant No. 1
Renovation
Post-Bid
$1,729,000 est. value
CA

Uninterruptible Power Supply Improvements at Plant 1
Renovation
Results
$5,765,789 CJ est. value
Fountain Valley, CA 92708

Recycled Water Storage Bay Rehabilitation - City of San Clemente
Renovation
Conception
$500,000 CJ est. value
San Clemente, CA 92672

Fullerton Kimberly Well 1A Well Rehabilitation
Infrastructure, Renovation
Bidding
$2,000,000 CJ est. value
Fountain Valley, CA 92708

Last Updated 10/03/2022 08:12 AM
Project Title

Return Activated Sludge Discharge Piping Replacement at Plant No. 1

Physical Address View project details and contacts
City, State (County) Fountain Valley, CA 92708   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $4,833,167 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Orange County Sanitation District (OC SAN) invites qualified Bidders to submit Bids for the RETURN ACTIVATED SLUDGE DISCHARGE PIPING REPLACEMENT AT PLANT NO. 1 Project. The project will replace approximately 600 feet of existing 30-inch steel discharge piping, valves, flexible couplings, and pipe supports in two aeration basins, and will install two permanent bypass risers on existing RAS piping This Project requires the following classification of Contractor s License: "A". The Invitation For Bid Documents may be viewed and downloaded through OC SAN s Vendor Portal at. Pursuant to Public Contract Code section 22300, Bidders may substitute approved securities to ensure performance under the Contract. The Project is subject to prevailing wage laws and requirements. Copies of the prevailing rate of per diem wages, as determined by the Director of Industrial Relations, applicable to the locality in which the Work is to be performed are on file at OC SAN s principal office and are available upon request or can be obtained online All contractors and subcontractors must be registered and qualified to perform public work under Labor Code section 1725.5 to bid on, be listed in a bid proposal for, or perform work on the Project. The Project shall be subject to compliance monitoring and enforcement by the California Department of Industrial Relations pursuant to Labor Code section 1771.4. The Project is located at AS1 RAS pump station (Plant No. 1 at 10844 Ellis Avenue, Fountain Valley, CA 92708). The Project will replace approximately 600 feet of existing 30-inch steel discharge piping, valves, flexible couplings, and pipe supports in two aeration basins, and will install two permanent bypass risers on existing RAS piping. C-NIB-012522

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents