Similar Projects
Miami Freedom Park & Soccer Village
New Construction - 1,000,000 SF
Conception
$1,000,000,000 est. value
Miami, FL

Kendall Town Center
New Construction - 1,174,730 SF
Conception
Miami, FL

Fifth Avenue Estates
New Construction
Design
Homestead, FL 33034

Drivers Club Miami
New Construction - 209,100 SF
Design
$100,000,000 est. value
Miami Gardens, FL

Edison Community Resource Center Renovation
Renovation
Post-Bid
Less than $670,630 est. value
Miami, FL

Guaranteed Maximum Prices for Renovation Services at the Arts and Recreation Center (ARC)
Renovation
Post-Bid
Opa-locka, FL 33054

Betty T. Ferguson Natatorium Interior and Locker Room Upgrades
Renovation
Results
Less than $500,000 est. value
Miami Gardens, FL 33142

Oasis Clubhouse Gym Remodel
Results
Homestead, FL 33033

Miami Women's Club
Renovation, Addition - 34,180 SF
Construction
$7,000,000 est. value
Miami, FL

Liberty Square - Phase II
New Construction - 20,000 SF
Construction
$41,792,388 est. value
Miami, FL 33147

Stellar Golden Glades
New Construction - 4,585 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

West Fourth Avenue Residential Development
New Construction
Design
Hialeah, FL 33014

Lakeside Community Center Renovations
Renovation
Results
Less than $200,000 est. value
Medley, FL 33178

Ocean Club Beach Club
Addition - 2,000 SF
Construction
Less than $500,000 CJ est. value
Key Biscayne, FL 33149

Veridian Grove - Phase II
New Construction
Conception
Kendall, FL 33156

Reported 11/15/2019 09:05 AM
Project Title

Douglas Park Community Center, D2

Physical Address View project details and contacts
City, State (County) Miami, FL 33133   (Miami-Dade County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club
Contracting Method Competitive Bids.
Project Status Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of, but is not limited to, the construction of a new single story +/- 12,200 square feet (“sf”) (5,900 sf interior and 6,300 sf exterior) Community Center Building; prepare underlying and adjacent grade. Environmental remediation and monitoring will be required for all excavations beyond 12” in depth. Interior Areas: Multi-purpose room, Flex Room, Park Manager’s Office, Neighborhood Enhancement Team (“NET”) office, Interior Storage, Mechanical Room, Electrical Room, Information Technology (“IT”) Room, Warming pantry/lounge, Women’s restroom, Men’s restroom, and a Janitor’s closet. All work shall comply with Americans with Disabilities Act (“ADA”). Installation of systems is related with architecture, structure, plumbing, mechanical, electrical and fire alarm. Included but not limited to installation of piles, grade beams, walls, roofs, windows, doors, fixtures, partitions, accessories, counter tops, lighting, ventilation, plumbing, metal vents, hose bibs, as well as wall, floor and ceiling finishes. Exterior Areas: Central Courtyard, Activity Plaza, Exterior Storage. The full scope of the Work is detailed in the Contract Documents. Construction of new building with accessible walkways all around the new building as per plans.

Details

Clubhouse/Social Club, Approximately 12,200 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Entrances, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents