Similar Projects
Crux Climbing Center
New Construction - 55,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Round Rock, TX 78665

Fire Station
New Construction
Conception
McQueeney, TX 78123

Jesuit College Preparatory School Field House
New Construction - 15,000 SF
Design
$7,000,000 est. value
Dallas, TX 75244

Kids Empire
Renovation - 14,000 SF
Design
Dallas, TX 75224

Berry Elementary School Replacement
New Construction - 103,783 SF
Bidding
$28,239,969 est. value
Arlington, TX 76010

Police Station Renovation
Renovation
Bidding
Corpus Christi, TX

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

New Royse City Fire Station No 1
New Construction - 10,500 SF
Post-Bid
$4,350,000 est. value
Royse City, TX 75189

Fort Bend County Emergency Services District No. 6 Fire Station No. 1
New Construction - 7,590 SF
Results
Richmond, TX 77469

South Central Police Station Interior Restoration - Hurricane Harvey
Results
$42,411 est. value
Houston, TX 77003

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

Fire Department Administration Building and Station
Construction
$3,250,000 est. value
Stafford, TX

Abilene Christian University Moody Coliseum
Renovation
Pending Verification
$39,000,000 est. value
Abilene, TX 79603

Improvements to Fire Station No. 5
Renovation
Pending Verification
$3,000,000 est. value
Richardson, TX

New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Last Updated 09/11/2021 07:45 AM
Project Title

Police Training Campus

Physical Address View project details and contacts
City, State (County) Temple, TX 76501   (Bell County)
Category(s) Entertainment/Recreation, Government/Public
Sub-Category(s) Athletic Facility, Fire/Police Station
Contracting Method Competitive Bids.
Project Status Obtained from a credible source, Awaiting verification
Bids Due View project details and contacts
Estimated Value $2,075,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Temple Police Department headquarters has a lecture-style training space with a maximum seating capacity of approximately 40 persons. The tiered classroom setting is conducive for lecture and computer aided presentations, as well as news briefi ngs, but is not functional for tactical or defensive tactics training. The space needs analysis recommends additional training space with room for 100 persons that can be divided into two 50 person rooms to accommodate the current 150+ sworn officers and 40+ non-sworn staff.

Details

Fire/Police Station, Addition, Athletic Facility, Addition.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents