Similar Projects
Alachua County School Board / 143rd St
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Gainesville, FL 32606

Northwest Highway 320 Infrastructure Surtax - STC073884 - Marion County
Infrastructure
Conception
$1,410,240 CJ est. value
Micanopy, FL 32667

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Mavis Tires & Brakes #623 / Gainesville
New Construction, Infrastructure - 8,032 SF
Bidding
$1,500,000 CJ est. value
Gainesville, FL 32653

Airline Ticket Office and Baggage Handling System Expansion Phase 1 and Central Energy Plant Replacement
New Construction, Infrastructure
Bidding
$2,111,587 CJ est. value
Gainesville, FL 32609

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Baker County Transportation Facility Bus Wash Building
New Construction, Infrastructure
Results
$478,093 CJ est. value
Macclenny, FL 32063

Sitework Contractor Services
Term Contract, Infrastructure
Results
Gainesville, FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Sonic at SW Archer Road / Gainesville
New Construction, Infrastructure - 4,920 SF
Pending Verification
$1,000,000 CJ est. value
Gainesville, FL 32608

Park Lane Planned Development Phase IIA
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Gainesville, FL 32608

El Indio
Addition, Infrastructure, Renovation - 2,630 SF
Conception
$600,000 CJ est. value
Newberry, FL 32669

Last Updated 07/12/2023 09:09 AM
Project Title

Glades County Us Hwy#27 Utility Corridor Infrastructure East Side Sewer Addition

Physical Address View project details and contacts
City, State (County) Moore Haven, FL 33471   (Glades County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The BIDS shall be based on providing all materials, equipment and labor for the construction of the Glades County US 27 Utility Corridor Infrastructure East Side Sewer Addition The project consists of the installation of a duplex submersible lift station and the installation of approximately 5,360 feet of 10- inch diameter force main including (2) 12 directional bores under the railroad tracks and the Caloosahatchee River. The Contractor shall be responsible for providing all materials, equipment and labor necessary for Glades County US 27 Utility Corridor Infrastructure East Side Sewer Addition as necessary to complete the project per the plans and specifications. Each BID shall be accompanied by a certified check or by an acceptable BID BOND in an amount equal to at least five (5) percent of the amount of the BID payable to Glades County, as a guarantee that if the BID is accepted the BIDDER will execute the CONTRACT and file acceptable PERFORMANCE AND PAYMENT SURETY BONDS equal to one hundred percent (100%) of the contract price within ten (10) days after written notice of the AWARD OF CONTRACT. No bidder may withdraw his BID for a period of ninety (90) days after date set for opening of the BIDS. Glades County reserves the right to: waive informalities in any BID, delete any portion of the project; extend the project within the limits of the work in- volved. The Owner has the right to accept or reject any or all bids

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents