Similar Projects
Supply of AMI Equipment - Contract 5
Post-Bid
Less than $590,000 est. value
Fall River, MA

Filter Vessel Piping Fabrication
Post-Bid
Less than $10,000 est. value
North Attleborough, MA

Six (6) Inch Water Main Installation - Franklin Street
Results
Less than $60,000 est. value
Attleboro, MA

Pine Street Water Main Improvements
Results
Less than $1,950,000 est. value
Norton, MA 02766

Water Main Materials
Post-Bid
North Dighton, MA

Rehabilitation of the East Filter Bed at the Wading RiverTreatment Facility
Results
Mansfield, MA 02048

Annual Public Work Material
Post-Bid
Dartmouth, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Meters and Advanced Metering Infrastructure (AMI)
Post-Bid
Fairhaven, MA

Supply and Delivery of Miscellaneous Pipe Fittings
Term Contract
Results
Less than $17,000 est. value
North Attleborough, MA 02760

Furnishing Ductile Iron Pipe, Hydrants, Hydrant Repair Kits/Parts, Gate Valves, Service Boxes, Corporations, Curb Stops, Gate Boxes, Polyethylene Tubing, Couplings, Hy Max Couplings, Transition Couplings, Repair Clamps, Service Saddles, Inserts and Thread Plugs
Post-Bid
Fall River, MA

Water Main Replacement Phase 19
Results
Less than $1,800,000 est. value
Fall River, MA 02722

Route 6 Pump Station Improvements and Sewer and Water Rehabilitation
Post-Bid
$920,000 est. value
Somerset, MA

Fire Hydrants
Results
Seekonk, MA

Installation of Approximately 8,700 Linear Feet of Eight-Inch Diameter Cement Lined Ductile Iron Water Main
Post-Bid
$2,000,000 est. value
North Attleborough, MA

Last Updated 03/25/2020 10:37 AM
Project Title

Roy Avenue Water Main Replacement

Physical Address View project details and contacts
City, State (County) Attleboro, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $185,000
Plans Available from Engineer - 01/09/20
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Contract generally consists of furnishing and installing approximately 400 linear feet (LF) of 8-inch HDPE water main and approximately 200 LF of 8-inch ductile iron water main along Roy Avenue in the City of Attleboro Massachusetts. The replacement includes service connections, valves, fittings, hydrants, and associated appurtenances. The 8-inch HDPE water main at the Sevenmile River Crossing shall be installed utilizing directional drilling methods. Where removed, the existing cast iron water main must be properly disposed of off-site. All locations shall be restored to equal or better condition including pavement, sidewalk and curbing restoration, and loam and seed.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents