Similar Projects
Last Updated | 03/25/2020 10:37 AM |
Project Title | Roy Avenue Water Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Attleboro, MA (Bristol County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $185,000 |
Plans Available from | Engineer - 01/09/20 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work of this Contract generally consists of furnishing and installing approximately 400 linear feet (LF) of 8-inch HDPE water main and approximately 200 LF of 8-inch ductile iron water main along Roy Avenue in the City of Attleboro Massachusetts. The replacement includes service connections, valves, fittings, hydrants, and associated appurtenances. The 8-inch HDPE water main at the Sevenmile River Crossing shall be installed utilizing directional drilling methods. Where removed, the existing cast iron water main must be properly disposed of off-site. All locations shall be restored to equal or better condition including pavement, sidewalk and curbing restoration, and loam and seed. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |