Similar Projects
Construction of a Five (5) Single-family Housing Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Green River, UT 84525

Construction of Drainage Project 2023
Infrastructure
Bidding
$177,000 CJ est. value
Castle Dale, UT 84513

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Cultural and Environmental MATOC
Term Contract
Post-Bid

Huntington State Park Restrooms Building
Demolition, New Construction, Infrastructure
Results
$698,223 CJ est. value
Huntington, UT 84528

CC and H Canal Pipeline Installation Project
Infrastructure
Results
$365,551 CJ est. value
Castle Dale, UT 84513

Abatement of Asbestos Fire Doors, Vinyl Tile and Mastic, TSI, Ceiling Tile, Roofing, Sheetrock, HVAC Sealant
Alteration
Post-Bid
Ferron, UT 84523

Department of Natural Resources Green River State Park Campground and Lodging Expansion
Addition, Demolition, Infrastructure
Results
$3,676,951 CJ est. value
Green River, UT 84525

Cultural and Environmental Resources Services (MATOC) (IDIQ)
Term Contract
Post-Bid

Lower Miller Creek BDAs
Infrastructure
Results
$20,000 CJ est. value
Orangeville, UT 84537

Construction of the Castle Dale North Chip Seal Project 2022
Infrastructure
Post-Bid
Castle Dale, UT 84513

Castle Dale City Bike Trail Project 2023
Infrastructure
Results
$199,879 CJ est. value
Castle Dale, UT 84513

Construction of the CVSSD - City Street Project 2022
Infrastructure
Post-Bid
Castle Dale, UT

Reclamation of BLM Pits, Rochester, South Moore and Lila Canyon
Infrastructure
Post-Bid
$223,000 est. value
Castle Dale, UT

Sidewalk Project, 2022
Infrastructure
Post-Bid
$80,000 CJ est. value
Orangeville, UT 84537

Last Updated 04/20/2023 09:10 AM
Project Title

Millsite County Road Riprap and Fish Habitat

Physical Address View project details and contacts
City, State (County) Ferron, UT 84523   (Emery County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Environmental, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,299,645 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

TSJ was awarded the contract for $1,299,645.85 The project involves placement of riprap along Ferron Canyon Road within the Millsite Reservoir and installation of fish habitat improvements. Placement of riprap will include a combination of excavation and fill placement to prepare the subgrade in addition to placement of the riprap. A portion of the needed riprap is provided by the owner with the balance being produced by the contractor at a borrow area near the project site. Production of riprap from the borrow area cannot commence until April 15. Fish habitat improvements involve use of 61 root balls from cottonwood trees removed as part of the site preparation for riprap placement. Willow cuttings will be planted in the riprap to compensate for wetland disturbance. OPENING: Contact Engineer for full Invitation to Bid. Bidding Documents will be available on February 17, 2023.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents