Similar Projects
Downtown Streetscape and Utility Improvements, Phase II
Post-Bid
Gainesville, GA 30501

Parking Lot and Trailhead
Post-Bid
Sandersville, GA

Parking Lot Resurfacing Repair of the Welcome Center Parking Lot
Results
Lincolnton, GA 30817

GC Services for Peachtree MS Site Access Improvements
Results
Less than $1,000,000 est. value
Atlanta, Dunwoody, GA 30338

Amazon Parking Lot Expansion
Construction
Smyrna, GA

Cedar Walk Apartments
Post-Bid
Hinesville, GA 31313

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

K-12 New Parking Lot
Post-Bid
GA

2019 Parking Lot Rehabilitation
Results
Clarkesville, GA 30523

Concrete Walkway - Governors Drive
Post-Bid
Forest Park, GA 30297

Construction of Streetscape and Atlanta Highway Sidewalk Phase II
Term Contract
Results
Bogart, GA 30622

Blakely Gateway Project
Post-Bid
Less than $800,000 est. value
Blakely, GA 31723

Parking Lot at Tom Pittman Field
Results
Aragon, GA 30104

Cumming City Center, FCHS Parking Lot
Post-Bid
Cumming, GA 30040

Davis Road Sidewalks
Results
Stockbridge, GA 30281

Last Updated 03/30/2020 04:12 PM
Project Title

Greenville Sidewalk and Street Scape Project

Physical Address View project details and contacts
City, State (County) Greenville, GA 30222   (Meriwether County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $69,669
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Greenville South Depot Street Sidewalk and Streetscape Project. Project begins at station 19+46 and ends at station 22+00 Construction easement acquisition will be the responsibility of the contractor. Sidewalk borderers are to be rectangular concrete Pavers. See symbol C sheet #7. Hexagonal Concrete Pavers are provided Rectangular concrete pavers and all other materials will be the responsibility of the Contractor. Granite slabs are to be carefully removed and neatly stacked on pallets in the vacant lot next to the new concrete pavers stock, for the City of Greenville. Landscape areas shown for plants and trees are to be filled with soil and 3” shredded pine mulch or equal. (no shrubs or trees) Any pavement markings that are removed during demolition and construction must be replaced.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents