Similar Projects
Fruit Valley Modernization
New Construction, Alteration
Bidding
$3,000,000 est. value
Vancouver, WA 98660

Install Weather Protection Structure, B983 PSNS
Alteration
Bidding
$250,000 to $500,000 est. value
Bangor, WA

Column Replacement Building 2500
Alteration
Post-Bid
$5,800 est. value
Vancouver, WA 98660

Traffic and Utility Box Wrap Fabrication and Installation
Term Contract
Post-Bid
Olympia, WA

Building 2001 Painting & Siding Repair Project
Alteration
Results
$403,975 to $446,500 est. value
Vancouver, WA 98660

Douglas Truth Branch Library Access Improvements
Renovation, Infrastructure, Alteration - 18,848 SF
Results
$450,000 to $500,000 est. value
Seattle, WA 98122

Hospital Site Improvements
Alteration
Bidding
$1,570,000 est. value
Ellensburg, WA

Structural Leak Joint Sealant and Grouting Repairs Work Order
Alteration
Post-Bid
WA

Gutter Replacement - Building 2901 and 3309
Alteration
Results
$20,000 to $24,000 est. value
Vancouver, WA 98660

Cowlitz Falls Hydroelectric Project Control Room Envelope Repairs
Alteration
Bidding
$900,000 est. value
Randle, WA 98377

Structural Support Repair
Alteration
Post-Bid
Sultan, WA

Building 2001 Roof and Gutter Project
Alteration
Results
$1,267,950 to $1,401,450 est. value
Vancouver, WA 98660

Avista Stadium Weatherization
Alteration
Post-Bid
$350,000 est. value
Spokane Valley, WA 99212

Weatherization Program
Alteration
Results
WA

Chimney and Fireplace Whitehorse Community Park
Alteration
Post-Bid
Darrington, WA 98241

Reported 07/21/2022 12:00 AM
Project Title

Seattle Overlook Walk Bid Package 4 - Exterior Improvement

Physical Address View project details and contacts
City, State (County) Seattle, WA   (King County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected September 2022,
Bids Due View project details and contacts
Estimated Value $35,698,756 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The Overlook Walk will create an elevated public park and connection between the waterfront to Seattle's urban core. People can walk on the elevated pathway from Pike Place Market to the waterfront without ever crossing the new Alaskan Way. Overlook Walk will have expansive views of Elliott Bay, informal play areas, new public plazas and landscaping. Overlook Walk is at the center of improvements from Pier 62 up to Pike Place Market and east along to Seattle's urban core, including Pike and Pine streets. Overlook Walk will also be integrated with Seattle Aquarium's proposed Ocean Pavilion expansion. Public access to the waterfront with gradual slopes and a new elevator. An elevated panorama of Elliott Bay, the Olympics & Mount Rainier. Protected areas with food and beverage and seating. Slides and other play elements for families. Terraced landscaping with native plants. The park structure will include a 355 square foot mechanical room, 5,437 square foot warehouse/storage, 3,315 square foot screened area, on the first floor. The second floor with have a 1,326 square foot cafe lease space / assembly area, 126 square foot restroom, 54 square foot mechanical room, and a 3,050 square foot canopy.

Details

10,612 SF Renovation.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents