Similar Projects
Manitowish - Hurley Const / Resurface
Infrastructure
Conception
$750,000 CJ est. value
Manitowish Waters, WI 54545

Range Concrete Work
Infrastructure
Design
$80,000 CJ est. value
Boulder Junction, WI 54512

Minocqua - Manitowish, CTH M to CTH W
Infrastructure
Bidding
$5,000,000 CJ est. value
Boulder Junction, WI 54512

Forest Edge Apartments - LDF
New Construction, Infrastructure
Post-Bid
$20,000,000 CJ est. value
Lac du Flambeau, WI 54538

2022 Road Improvements
Infrastructure
Post-Bid
$400,000 CJ est. value
Boulder Junction, WI 54512

Grind and Repave Camp Road
Infrastructure
Results
$60,878 CJ est. value
Eagle River, WI 54521

2023 Alley Reconstruction
Infrastructure
Results
$149,745 CJ est. value
Eagle River, WI 54521

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Lac Du Flambeau Band Of Lake Superior Chippewa Indians Request For Proposals For Resurfacing Of Multiple Driveways
Infrastructure
Post-Bid
$300,000 CJ est. value
Lac du Flambeau, WI 54538

Road Striping 2023
Infrastructure
Results
$159,597 CJ est. value
Eagle River, WI 54521

Lakeview Circle Project
Infrastructure
Post-Bid
$110,000 CJ est. value
Phelps, WI 54554

2023 CTH M Roadwork CTH K to Marsh Lane LRIP CHI Project
Infrastructure
Results
$434,740 CJ est. value
Eagle River, WI 54521

RFP D/B - Tribal Broadband Connectivity Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Lac du Flambeau, WI 54538

2023 CTH M Roadwork Marsh Lane to Center St.
Infrastructure
Results
$103,855 CJ est. value
Eagle River, WI 54521

Lac du Flambeau Chippewa Housing Authority LIHTC II
New Construction, Infrastructure
Post-Bid
$10,185,106 CJ est. value
Lac du Flambeau, WI 54538

Last Updated 02/28/2023 04:03 AM
Project Title

Construction of a New Fire Station #1

Physical Address View project details and contacts
City, State (County) Lac du Flambeau, WI 54538   (Vilas County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner (hereinafter referred to as Town of Lac Du Flambeau: A. Susan Schoonover Deputy Town Clerk B. 109 Old Abe Road C. Lac du Flambeau, Wi 54538 And the Architect (hereinafter referred to as Architecture North, Ltd.): A. Architecture North, Ltd, Glenn Morrison Project Architect C. Woodruff, WI 54568. New construction, approximately 18500 sq ft. Steel frame, truss joists, bar joists, and masonry exterior walls. Interior partitions steel stud and drywall. 2900 sq ft Storage Mezzanine with pre-cast concrete floors and In-floor heating. C. All bidders are required to prequalify to the requirements described in Document 00 2113 - Instructions to Bidders. Allow 3working days for printing. E. Documents may be obtained only by general contract and major subcontract Bidders. Others may view the Bid Documents at the office of the Architect. The TOWN OF LAC DU FLAMBEAU reserves the right to accept or reject any and all bids, and select the bid(s) deemed to be in the Town's best interest.

Details

18,500 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents