Similar Projects
Booneville School District Sports Complex Site Package
New Construction, Infrastructure
Bidding
$550,000 CJ est. value
Booneville, MS 38829

Emergency Road and Bridge Repair Fund Project - Structure No. SA5900000000029 County Road 1475
Infrastructure
Bidding
$400,000 CJ est. value
Burnsville, MS 38829

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Booneville/Baldwyn Airport Runway and Taxiway Overlay
Infrastructure
Post-Bid
$2,261,723 CJ est. value
Baldwyn, MS 38824

West Industrial Park Access and and Site Improvements Phase 2
Infrastructure
Results
MS

Grade, Drain, Base and DBST Pave
Infrastructure
Results
$953,202 CJ est. value
Booneville, MS 38829

County Road 601 Gas Line Extension
Infrastructure
Bidding
$150,000 CJ est. value
Booneville, MS 38829

Emergency Road and Bridge Repair Fund Project on County Road 8301
Infrastructure
Post-Bid
$200,000 CJ est. value
Booneville, MS 38829

The Construction of 1.336 Miles of Grade, Drain, Base and Surface
Infrastructure
Results
$953,202 CJ est. value
Booneville, MS 38829

Dollar General #25307 / Booneville
New Construction, Infrastructure - 10,733 SF
Post-Bid
$2,000,000 CJ est. value
Booneville, MS 38829

Sidewalk Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Booneville, MS 38829

Sports Complex
New Construction, Infrastructure
Post-Bid
Booneville, MS 38829

Jumpertown Sidewalk Improvements
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Jumpertown, MS 38829

Wastewater System Improvements-2021
Infrastructure
Post-Bid
$251,714 CJ est. value
Booneville, MS 38829

Phase One Water System Improvements
Infrastructure
Post-Bid
$750,000 CJ est. value
Booneville, MS 38829

Last Updated 09/28/2023 11:46 AM
Project Title

Phase Two - AMR Meter Replacement Project

Physical Address View project details and contacts
City, State (County) Booneville, MS 38829   (Prentiss County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Phase Two - AMR Meter Replacement Project A satisfactory Bid Bond executed by the Bidder or an accepted Surety, a certified check, or bank draft payable to the WHEELER FRANKSTOWN WATER ASSOCIATION, on negotiable U.S. Government Bonds (at par value), shall be submitted with each bid in an amount equal to five percent (5%). Minority and women's business enterprises are solicited to bid on this contract as prime contractors, and are encouraged to make inquiries regarding potential subcontracting opportunities and equipment, material, and/or supply needs. of the total bid. Questions regarding website registration, online orders or electronic bidding requirements, please contact Plan House Printing in Tupelo, MS at (662) 407-0193 or email tupelo@planhouseprinting.com. Partial sets of Bidding Documents will not be available and neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the plan room.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents