Similar Projects
Landmark Fire Station - City of Alexandria
New Construction
Conception
$23,351,300 est. value
Alexandria, VA 22314

Fire Station 205 Replacement - City of Alexandria
New Construction, Demolition
Conception
$28,706,300 est. value
Alexandria, VA 22314

King and South Henry Street Mixed-Use Development
New Construction, Infrastructure - 15,000 SF
Design
$10,000,000 CJ est. value
Alexandria, VA 22314

765 John Carlyle Senior Living / Eisenhower Avenue Offices
LEED Certification, New Construction, Infrastructure - 395,000 SF
Design
$79,000,000 CJ est. value
Alexandria, VA 22314

Charles Barrett Recreation Center Playground Renovation
Infrastructure
Bidding
$600,000 CJ est. value
Alexandria, VA 22302

RFQ Contractor - Phlipott Landslide Construction
Infrastructure
Post-Bid
$10,000,000 CJ est. value
Bassett, VA 24055

Virginia State University Academic Commons Building Project
Demolition, Renovation, Infrastructure - 174,000 SF
Post-Bid
$100,000,000 CJ est. value
Petersburg, VA 23803

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

Resumption of the Patrick Henry Pre-K 8/Recreation Center - Phase III
Term Contract, Demolition, Infrastructure
Results
$6,998,000 CJ est. value
Alexandria, VA 22304

Braddock West
New Construction, Infrastructure - 2,000 SF
Construction
$66,750,000 CJ est. value
Alexandria, VA 22314

North Fairfax Street Mixed-Use Development
New Construction, Infrastructure, Build-out - 240,000 SF
Pending Verification
$36,600,000 CJ est. value
Alexandria, VA 22314

Potomac River Generating Station Redevelopment Master Plan
Demolition, New Construction, Infrastructure - 2,290,000 SF
Pending Verification
$150,000,000 CJ est. value
Alexandria, VA 22314

Burn Building Replacement - City Of Alexandria
New Construction
Conception
$3,015,900 est. value
Alexandria, VA 22314

North Potomac Yard Buildings 15 and 19
LEED Certification, New Construction, Infrastructure
Design
$178,000,000 CJ est. value
Alexandria, VA 22301

Public Safety Center (PSC) Kitchen Renovation (Re-bid 2)
Renovation
Post-Bid
$2,310,999 CJ est. value
Alexandria, VA 22314

Last Updated 05/08/2023 04:13 PM
Project Title

Fire Station 208 Replacement - City of Alexandria

Physical Address View project details and contacts
City, State (County) Alexandria, VA 22304   (Alexandria City County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $23,351,300 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Fire Station 208, built in 1976, is currently 44 years old and will be at the end of its expected life cycle for a fire station at the time the planned construction of its replacement (FY 2024) is anticipated. The current facility is not adequate to accommodate the current specifications of an up-to-date fire station and the site is not ideally located to provide optimal service coverage to the community nor is the current site large enough to fulfil the needs of a larger fire station. To serve the community effectively, the fire station will need to be built in a new location and to current industry specifications. Having this new fire station will allow the fire department to have more capacity when it comes to handling emergencies. At this time, planning is under way to relocate this station to the Landmark Mall redevelopment site and would likely be comprised of a fire station on the first level and workforce/affordable multi-family housing comprising the upper floors. The current funding provides for a facility of approximately 12,000 square feet and will include four bays to accommodate apparatus, as well as administrative, physical fitness, and living space for a minimum of 12 on-duty staff. Concept discussions are underway so the size and programming needs may change, therefore affecting the current planning budget. As appropriate, projects will adhere to the City's Green Building Policy, adopted in June 2019, and any future green policies, initiatives, and code requirements that are forth coming. The project is included in the city's 2022-2026 Capital Improvement Program (CIP). As of April 25, 2023, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

12,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents