Similar Projects
Reconstruction of the Newark Street Drainage Culvert
Term Contract
Post-Bid
Lindenhurst, NY 11757

Corrugated Metal Pipe Arches and Aluminized Pipe Arches
Post-Bid
Owego, NY 13827

Honey Hill Road Outfall Channel Restoration
Results
Fort Plain, NY

Zukowski Drive Drainage Improvements Phase 1
Results
Less than $300,000 est. value
Garnerville, NY

Aluminized Type 2 Corrugated Steel Pipe
Term Contract
Post-Bid
Schenectady, NY 12305

Gooseberry Creek Revitalization Strategy - Creek Walk Park
Results
Less than $300,000 est. value
Tannersville, NY

Pre-Cast Catch Basin and Frame and Grate
Term Contract
Post-Bid
Schenectady, NY 12305

Monkey Run Road Culvert Replacement
Results
Port Crane, NY

Hydro Plant Canal Maintenance Project
Post-Bid
Watertown, NY 13601

Mirror Lake Drive Sidewalk, Drainage and Pavement Improvements
Results
Less than $1,100,000 est. value
Lake Placid, NY

Corrugated Metal Pipe
Term Contract
Post-Bid
Delmar, NY 12054

Mirror Lake Drive Sidewalk, Drainage & Pavement Improvements
Results
Less than $1,600,000 est. value
Lake Placid, NY 12946

Replacement of County Road 33 (CB 198) Culvert over Blind Pond Brook
Post-Bid
Monticello, NY 12701

Replacement of Hannibal Street over Meadow Brook
Term Contract
Results
Fulton, NY 13069

Public Works Materials
Term Contract
Post-Bid
Fonda, NY 12068

Last Updated 06/02/2021 08:46 AM
Project Title

Batavia Kill Restoration at Red Falls - Project 1 - Contract 2

Physical Address View project details and contacts
City, State (County) Prattsville, NY   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of the restoration of approximately 1,600 linear feet of stream channel, and will include excavation and fill to create a new aligned stream channel as well as construction of in-stream rock structures and rock revetment. Work items also include the installation of various bioengineering practices and the creation of riparian and wetland areas and various plantings.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents