Similar Projects
Last Updated | 09/19/2022 09:38 AM |
Project Title | Monroe County Jail Bar Screen Project |
Physical Address | View project details and contacts |
City, State (County) | Woodsfield, OH 43793 (Monroe County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $367,500 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work to be bid upon is described as follows: The work shall consist of installation of approximately 425 LF of 8 PVC sanitary sewer pipe, 4 sanitary sewer manholes, 1 bypass manhole, 30 LF of 16 steel casing bore & jack, 45 LF of corrugated plastic pipe, Pre-Fabricated Building, 6 diameter flat-top manhole, automatic bar screen unit, gravel access road and site grading, surface restoration, reconnection to existing system and all other necessary appurtenances. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be EJCDC C-111, Suggested Advertisement for Bids for Construction Contracts. Copyright 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. All construction contracts shall include a provision for compliance with: Copeland Anti-Kick Back Act (18 U.S.C. 874) (See Attached) as supplemented in Department of Labor Regulations (29 CFR, Part 3). This Act provides that the contractor is prohibited from inducing, by any means, any person employed in the construction, completion, or repair of public work, to give up any part of the compensation to which he is otherwise entitled. The Project Sponsor shall report all suspected or reported violations to the ODRC. Equal Employment Opportunity Construction Contract Compliance. State assisted construction projects are subject to the January 27, 1972 Equal Employment Opportunity Executive Order of the Governor of Ohio. Regulations set forth by the Ohio Department of Administrative Services will apply to each construction contract awarded. Project Sponsors receiving complaints alleging contractor and/or subcontractor to the ORDC. In the event the Project Sponsor fails or refuses to comply with these requirements, the Project Sponsor is subject to sanctions such as: Cancellation, termination, suspension in whole or in part of the Legislative allocation Refraining from extending any further assistance to the Project Sponsor until satisfactory assurance of future compliance has been received; Referring the case to the Attorney General for appropriate legal action. Contracts in excess of $100,000 shall contain a provision which requires the recipient to agree to comply with all applicable standards, orders or regulations issued pursuant to the Clean Air Act of 1970 if the project scope will impact emissions from stationary (Industrial) sources or mobile sources. Report violations to the ODRC. State Prevailing Wages Section 509.06. Prevailing Wage Requirement Exempt as provided in section 4115.03 of the Revised Code, unless the mechanics, laborers, or workers engaged therein are paid the prevailing rate of wages prescribed in section 4115.04 of the Revised Code. Nothing in this section affects the wages and salaries established for state employees under Chapter 124. Of the Revised Code, or collective bargaining agreements entered into by the state under Chapter 4117. Of the Revised Code, while engaged on force account work, nor does this section interfere with the use of inmate and patient labor by the state. Wage Rates will be supplied via an addendum 10 days prior to the date of the bid opening. Bid security shall be furnished in accordance with the Instructions to Bidders. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |