Similar Projects
Copper Steppe at Greeley Mall
New Construction
Design
$13,600,000 est. value
Greeley, CO 80634

Summit View Estates Neighborhood Park Renovation Project
Renovation
Bidding
Less than $135,000 est. value
Longmont, CO 80504

Coalridge Neighborhood Park Renovation
Post-Bid
Frederick, CO 80530

2020 Park Amenities Bid
Post-Bid
Frederick, CO 80530

Koshio Park Renovation
Renovation
Results
Less than $250,000 est. value
Fort Lupton, CO

Village Park Tennis Court Replacement
Results
$150,000 to $200,000 est. value
Evans, CO 80620

Construction Manager at-Risk / GC - Erie Community Park Final Phase
Construction
Less than $5,350,000 est. value
Erie, CO 80516

Redtail Ranch Master Planned Community
New Construction
Pending Verification
Erie, CO 80516

Playground Surface Repair - Martinez Elementary School
Post-Bid
Greeley, CO 80631

Foxhill Park Project
Results
$350,000 to $375,000 est. value

Neighbors Point Park Project
New Construction
Post-Bid
Firestone, CO

Centennial Park Improvements - Phase 0.5
Results
$209,530 to $336,144 est. value
Greeley, CO 80631

Willow Bend Community
New Construction
Post-Bid
Fort Lupton, CO 80621

Centennial Park Improvements Design Build
Results
Less than $200,000 est. value
Frederick, CO 80530

Phase 1.0 Centennial Park Improvements
Results
Less than $2,104,777 est. value
Greeley, CO

Last Updated 07/01/2021 11:13 AM
Project Title

Outdoor Fitness Area Demo and Build

Physical Address View project details and contacts
City, State (County) Firestone, CO   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to provide specific architectural designs of the outdoor fitness area and supporting subcontractors and vendors for overall scope of job. The Bid should include specified demo of the area by removing existing planter and trees, concrete, shrubs, and dirt and haul away all demoed materials. Will include prepping and pouring area for concrete and ensure leveling and proper drainage for new concrete installation. Prepare area and install outdoor synthetic-turf and/or rubber flooring in specified areas designated by CVPRD. Contractor and flooring subcontractor will work with CVPRD and fitness equipment vendor to ensure measurements and placement of outdoor equipment configuration and installed flooring. Outdoor lighting will be installed on outside wall of existing building, and posts that illuminates area. Install weatherproof electrical outlets where existing outlets currently are located on building. Installation of weatherproof canopies to overall protect the area but allow some natural light along with highlighting the CVPRD color scheme. Fencing will be wrought iron material and a minimum of 8 feet and have spike tips to deter illegal entry. To include two gates, one double and one single both with panic bars to secure area by allowing emergency exit and secured entrance. Double gate will house key fob access to be installed later by CVPRD.

Details

Park/Playground, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 10 - Specialties, Protective Covers, Canopies, Manufactured Exterior Specialties, Weathervanes.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents