Similar Projects
Seven Trees Community Center And Branch Library Roof Replacement - City of San Jose
Renovation, Infrastructure
Conception
$275,000 est. value
San Jose, CA 95111

RFQ Contractor - San Luis Rey Elementary School Campus Modernization - Roofing
Renovation
Sub-Bidding
$400,000 CJ est. value
Oceanside, CA 92054

Water Tank Roof Replacement San Quentin State Prison
Renovation
Sub-Bidding
$400,000 CJ est. value
San Quentin, CA 94964

Laney College Waterproofing Repairs - Phase III
Alteration
Post-Bid
Oakland, CA 94607

Master As-Needed Agreement M16 Roofing Services
Alteration
Post-Bid
$700,000 est. value
San Francisco, CA

National Roofing Program (NRP) - Roofing Construction Project #4
Term Contract
Results
$250,000 to $500,000 est. value
Marina, CA

Repair Building Roof
Alteration
Results
$2,300,000 est. value
CA

Lawler Lodge Roofing Project
Renovation
Sub-Bidding
$200,000 CJ est. value
Idyllwild, CA 92549

Rooftop Solar Panel Repairs
Term Contract
Post-Bid
Richmond, CA 94801

Modesto Junior College Regional Fire Training Center Roof Tile and Ceiling Tile Replacement
Alteration
Results
$450,000 est. value
Modesto, CA 95351

Senior Center Roof
Renovation
Sub-Bidding
$130,000 CJ est. value
Camarillo, CA 93010

CHP Crescent City Area Office - Roof Maintenance Services
Alteration
Post-Bid
Crescent City, CA 95531

Port of Stockton Shed 15 Roof Coating
Alteration
Results
Stockton, CA 95203

Roof Replacement at HUB (HUSD Parent Resource Center)
LEED Certification, Renovation
Sub-Bidding
$1,067,000 CJ est. value
Hayward, CA 94544

Transportation Building Roofing & HVAC Phase II
Alteration
Post-Bid
Bakersfield, CA 93314

Last Updated 10/02/2022 11:34 PM
Project Title

2022 Summer Roofing Project Package #2

Physical Address View project details and contacts
City, State (County) Concord, CA 94520   (Contra Costa County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $5,184,460 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

governing board (Board) of the Mt. Diablo Unified School District (District or Owner) will receive sealed bids for the following project, (Project or Contract): BID# 1905 2022 Summer Roofing Project Package 2 Any claim by a bidder of error in its bid must be made in compliance with section 5100 et seq. of the Public Contract Code. Any bid that is submitted after this time shall be non-responsive and returned to the bidder. The Project consists of: Demo existing roofing and replace with new Garland 2-ply system per plans & specs: Pine Hollow MS; Highlands ES, El Dorado MS, and Westwood ES. Contract documents must be supplied without delay in order to meet a mobilization date no later than May 27, 2022. Substantial completion means all HOT WORK AND METAL TRIM needs to be 100% complete. Work is expected to be substantially completed by August 3, 2022. All bids shall be on the form provided by the District. Each bid must conform and be responsive to all pertinent Contract Documents, including, but not limited to, the Instructions to Bidders. To bid on this Project, the Bidder is required to possess one or more of the following State of California Contractor Licenses: B and/or C-39 OR B and C-39. The Bidder's license(s) must be active and in good standing at the time of the bid opening and must remain so throughout the term of the Contract. ailure to attend or tardiness may render bid ineligible. COVID-19 SITE WALK SAFETY PRECAUTIONS WILL BE ENFORCED The District's Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening. The District shall award the Contract, if it awards it at all, to the lowest responsive responsible bidder based on: The base bid amount and including Add/Alts. Last addenda to be issued not later than 72 hours prior to bid opening date and time, therefore all questions are due no later than 5 business days prior to the bid opening. Only one (1) representative from a company is allowed to attend a site-walk. Prior to attending the site walk, all attendees must fill out the attached questionnaire for COVID-19 screening. Questionnaires will be collected immediately prior to the site walk. All attendees will be required to wash or sanitize their hands prior to the start of the site walk. Hand sanitizer will be provided by the District. No physical contact is allowed. This means, but is not limited to: handshaking, high- fives, elbow bumping or fist bumping. Face coverings are required to be worn by all persons (District staff and visitors). Face coverings must cover one's nose and mouth. Do not touch your face covering until you remove it, and then wash/sanitize your hands. Stay 6 feet apart, even with a face covering. A "No Congregation" policy is in effect. Individuals must implement physical distancing by maintaining a minimum distance of 6 feet from other individuals. In areas where required physical distancing is impossible, one person at a time will be allowed to view a specific area.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents