Similar Projects
Hallmark Property Development - Warrior
New Construction, Infrastructure
Conception
$10,000,000 CJ est. value
Warrior, AL 35180

Toomer`s Corner - Mixed-Use Development
New Construction, Demolition
Design
Auburn, AL 36830

Five Guys / Jubilee Square
Build-out - 2,500 SF
Design
$390,000 CJ est. value
Daphne, AL 36526

Krystal / Arab
Demolition, Renovation, Infrastructure - 4,012 SF
Bidding
$200,000 CJ est. value
Arab, AL 35016

Walmart Supercenter #1229.250 Remodel / Hoover
Renovation
Bidding
$1,000,000 CJ est. value
Hoover, AL 35244

Guthrie's
New Construction - 2,092 SF
Post-Bid
$500,000 to $1,000,000 CJ est. value
Montgomery, AL 36117

Arby's / Montgomery
New Construction, Infrastructure
Post-Bid
$600,000 CJ est. value
Montgomery, AL 36117

Auburn STEM and AG Sciences Complex
New Construction, Infrastructure - 265,000 SF
Results
$178,675,000 CJ est. value
Auburn, AL 36830

JEFCOED Kitchen Hood and Serving Line Renovations to Burkett Center and Snow Rogers Elementary School
Renovation
Results
$100,000 CJ est. value
Kimberly, AL 35091

Panera Bread - Shell Only
New Construction - 6,000 SF
Construction
$950,000 est. value
Montgomery, AL 36117

Magnolia Point
Renovation - 5,500 SF
Construction
Birmingham, AL 35205

Hotel Indigo / Huntsville
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Huntsville, AL 35801

Orange Beach Cantina Restaurant
New Construction, Infrastructure - 8,505 SF
Pending Verification
$3,000,000 CJ est. value
Orange Beach, AL 36561

Mama CoCo Cantina and Grill
Renovation
Design
Vestavia Hills, AL 35216

Walmart Supercenter #1481.239 Remodel / Homewood
Renovation - 12,465 SF
Bidding
$1,000,000 CJ est. value
Homewood, AL 35209

Last Updated 10/18/2023 01:32 AM
Project Title

Walmart Supercenter #355.1001 Special Project / Opelika-Rebid

Physical Address View project details and contacts
City, State (County) Opelika, AL 36801   (Lee County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method Bids by Invitation
Project Status Construction start expected January 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

Per Walmart bids of Oct 18, 2023, were cancelled. A new due date will be announced at a later time *The owner has determined a list of select general contractors to bid on this project. *The Editorial Content Team is in the process of confirming all invited GC bidders. *Due to the direct relationship with Walmart, the only project contacts are the general contractors invited to bid. At this time Walmart works with a select group of pre-approved general contractors. Walmart is not accepting new general contractor qualifications at this time.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents